BUILDING PLAN MANAGEMENT SYSTEM

By Urban Development Department

\ Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:- https://shorturl.at/hGZ37
:
7147
:
DDMCM202200009
:
Komal Dhananjay Kale
:
:
26/09/2022
:
DDMCM-22-00563
:
Residential
:
389.6
:
A
:
1.10-खोलेश्वर विद्यालय ते मांडवा रस्ता
:
SANGLI
:
4
:
63
:
0
:
1.50
:
389.6
RESIDENTIAL
Residential
multi-family dwellings
1107.73 Sq. mt.
0
14
1
0.00
0.90
1107.73 Sq. mt.
0.00 Sq. mt.
0.00 Sq. mt.
 
0.00
0.00
45.70
No
 
No
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor useParking FloorGround FloorStilt FloorEx - Floor Area Floor Used Area Floor Usage Part OC Taken Or Not Typical Floor Part Oc Applied Yes /No Part Oc Applied Area
GROUND FLOOR3.200.904.1057.85ResidentialNoYesYes0.000.00ResidentialNoNoNo0
FIRST FLOOR3.204.107.3080.76ResidentialNoNoYes0.000.00ResidentialNoNoNo0
SECOND3.207.3010.5080.76ResidentialNoNoYes0.000.00ResidentialNoNoNo0
THIRD3.2010.5013.7080.76ResidentialNoNoYes0.000.00ResidentialNoNoNo0
FOURTH3.2013.7016.9080.76ResidentialNoNoYes0.000.00ResidentialNoNoNo0
FIFTH3.2016.9020.1080.76ResidentialNoNoYes0.000.00ResidentialNoNoNo0
SIXTH3.2020.1023.3080.76ResidentialNoNoYes0.000.00ResidentialNoNoNo0
SEVENTH3.2023.3026.5080.76ResidentialNoNoYes0.000.00ResidentialNoNoNo0
EIGHT 3.2026.5029.7080.76ResidentialNoNoYes0.000.00ResidentialNoNoNo0
NINE3.2029.7032.9080.76ResidentialNoNoYes0.000.00ResidentialNoNoNo0
TEN3.2032.9036.1080.76ResidentialNoNoYes0.000.00ResidentialNoNoNo0
ELEVEN3.2036.1039.3080.76ResidentialNoNoYes0.000.00ResidentialNoNoNo0
TWELVE3.2039.3042.5080.76ResidentialNoNoYes0.000.00ResidentialNoNoNo0
THIRTEEN3.2042.5045.7080.76ResidentialNoNoYes0.000.00ResidentialNoNoNo0
 
 
Done
Pending
Reject
Engineer
Pending
Approved
Service Name : Building Permission
Steps No. Authority / ApplicantDesignationApplication Received DateApplication Forward/Approve DateDuration(In Days)Expected Completion DaysDelay(In Days)Project Verified By TechnicalPre Approval PaymentDocument VerificationSite InspectionPost Approval Payment VerificationPost Approval PaymentArchitect Digital Signature StatusCertificate IssuedStatus / ActionRemark
1komal patilEngineer26/09/202227/09/2022160NANANANANANAForwarded-
2Annaso MagdumJunior Engineer26/09/202227/09/2022000NANANANANANANAForwarded
3Annaso MagdumJunior Engineer26/09/202227/09/2022000NANANANANANANAForwarded
4Annaso MagdumJunior Engineer26/09/202227/09/2022000NANANANANANANAPending
5Shamrav GejgeDraughtsman--1300NANANANANANANANADocument Reassign
6komal patilEngineer--160NANANANANANAForwardedNA
7Shamrav GejgeDraughtsman-03/10/2022130NANANANANANANAForwarded
8Asst Town PlannerAssistant Town Planner--1300NANANANANANANANAPending
Building Permission Insepction Report Detail
Sr No.AuthorityDesignationSite Visited DateVisit Start TimeVisit End TimeSite Inspection Report
1Shamrav GejgeDraughtsman03/10/202203:30 pm05:30 pmView pdf