Toggle navigation
Home
मराठी
User Guide
Presentations
Manuals
FAQs
FAQs - TP-Client(Drawing)
Application(Online)
FAQs - Operational Issue
FAQs - Payment Issue
FAQs - Others Issue
Do's and Don'ts
UDCPR
Circular
Patch
Login
BUILDING PLAN MANAGEMENT SYSTEM
By Urban Development Department
\
Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:-
https://shorturl.at/hGZ37
Proposal Status for Renewal Building Permission
Proposal No
:
7141
Application No
:
DDCMC/2022/7141/1907
Owner Name
:
ROSHAN ISHWAR NAGULWAR
Additional Owner List
:
View
×
Additional Owner List
Sr No
Name
Address
Mobile No
Email
No result Found
Proposal Date
:
18/02/2021
Proposal Code
:
DDCMC-22-ENTRY-00538
Proposal Type
:
Residential
Proposal Plot Area
:
150
TDR Zone
:
Site Area
:
6.270-अंतरà¥à¤—त à¤à¥à¤–ंड
Site Details
Site Address
:
SURVEY NO.2 MOUZA-CHANDA RYT CHANDRAPUR
Site Location
:
Municipal Corporation
Survey Number
:
Plot Number
:
15
Premium FSI
:
Plot Area
:
150
Building and Floor Details
Building Name :
ROSHAN BUILDING
Building Category :
Residential
Sub Category :
Independent single family
Total Built Up Area :
50 Sq. mt.
No.of Tenements :
0
No. of Levels :
1
No. of Buildings :
1
Basement Height(m) :
0.60
Plinth Level(m) :
0.60
Residential Built Up Area :
50.00 Sq. mt.
Commercial Built Up Area :
0.00 Sq. mt.
Industrial Built Up Area :
0.00 Sq. mt.
Educational Buildup Area :
0.00
Institutional Buildup Area :
0.00
Building Height :
0.00
Plinth Intimation Taken :
No
Part Occupancy Taken :
No
Floor Details
Floor Name
Floor Height(m)
Bottom Level
Top Level
Floor Area
Floor use
Parking Floor
Ground Floor
Stilt Floor
Ex - Floor Area
Floor Used Area
Floor Usage
Part OC Taken Or Not
Typical Floor
Part Oc Applied Yes /No
Part Oc Applied Area
Proposal Timeline Details
Done
Pending
Reject
Pending
Approved
Service Name
: Renewal Building Permsission
Steps No.
Authority / Applicant
Designation
Application Received Date
Application Forward/Approve Date
Duration(In Days)
Expected Completion Days
Delay(In Days)
Project Verified By Technical
Pre Approval Payment
Document Verification
Site Inspection
Post Approval Payment Verification
Post Approval Payment
Architect Digital Signature Status
Certificate Issued
Status / Action
Remark
1
26/08/2022
26/08/2022
1
6
0
NA
NA
NA
NA
NA
NA
NA
NA
Forwarded
2
Sarika Shirbhate
Assistant Town Planner
-
26/08/2022
1
30
0
NA
NA
NA
NA
NA
NA
Forwarded
3
Bhalchandra Behare
Deputy Municipal Commissioner
-
26/08/2022
1
30
0
NA
NA
NA
NA
NA
NA
Reject
Renewal Building Permsission Insepction Report Detail
Sr No.
Authority
Designation
Site Visited Date
Visit Start Time
Visit End Time
Site Inspection Report
1
Sarika Shirbhate
Assistant Town Planner
26/08/2022
05:30 pm
07:30 pm
View pdf
Close
Top