Toggle navigation
Home
मराठी
User Guide
Presentations
Manuals
FAQs
FAQs - TP-Client(Drawing)
Application(Online)
FAQs - Operational Issue
FAQs - Payment Issue
FAQs - Others Issue
Do's and Don'ts
UDCPR
Circular
Patch
Login
BUILDING PLAN MANAGEMENT SYSTEM
By Urban Development Department
\
Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:-
https://shorturl.at/hGZ37
Proposal Status for Full Occupancy
Proposal No
:
7122
Application No
:
VVCMC/2022/7122/1919
Owner Name
:
ROHINI THAKARE
Additional Owner List
:
View
×
Additional Owner List
Sr No
Name
Address
Mobile No
Email
No result Found
Proposal Date
:
11/06/2020
Proposal Code
:
VVCMC-22-ENTRY-00492
Proposal Type
:
Residential
Proposal Plot Area
:
1100
TDR Zone
:
Site Area
:
naigaon
Site Details
Site Address
:
VASAI
Site Location
:
Municipal Corporation
Survey Number
:
Plot Number
:
0
Premium FSI
:
Plot Area
:
1100
Building and Floor Details
Building Name :
BUILDING 1
Building Category :
Residential
Sub Category :
flats
Total Built Up Area :
800 Sq. mt.
No.of Tenements :
0
No. of Levels :
4
No. of Buildings :
1
Basement Height(m) :
0.60
Plinth Level(m) :
0.60
Residential Built Up Area :
800.00 Sq. mt.
Commercial Built Up Area :
0.00 Sq. mt.
Industrial Built Up Area :
0.00 Sq. mt.
Educational Buildup Area :
0.00
Institutional Buildup Area :
0.00
Building Height :
0.00
Plinth Intimation Taken :
Yes
Part Occupancy Taken :
Yes
Floor Details
Floor Name
Floor Height(m)
Bottom Level
Top Level
Floor Area
Floor use
Parking Floor
Ground Floor
Stilt Floor
Ex - Floor Area
Floor Used Area
Floor Usage
Part OC Taken Or Not
Typical Floor
Part Oc Applied Yes /No
Part Oc Applied Area
Proposal Timeline Details
Done
Pending
Reject
Pending
Approved
Service Name
: Full Occupancy
Steps No.
Authority / Applicant
Designation
Application Received Date
Application Forward/Approve Date
Duration(In Days)
Expected Completion Days
Delay(In Days)
Project Verified By Technical
Pre Approval Payment
Document Verification
Site Inspection
Post Approval Payment Verification
Post Approval Payment
Architect Digital Signature Status
Certificate Issued
Status / Action
Remark
1
15/12/2022
15/12/2022
1
6
0
NA
NA
NA
NA
NA
NA
NA
NA
Forwarded
2
mitali dhangar
Junior Engineer
-
22/12/2022
1
8
0
NA
NA
NA
NA
NA
NA
Forwarded
3
DDTP DDTP
Deputy Municipal Commissioner
-
22/12/2022
1
8
0
NA
NA
NA
NA
NA
Forwarded
4
Municipal Commissioner
Municipal Commissioner
-
22/12/2022
1
8
0
NA
NA
NA
NA
NA
NA
Forwarded
5
DDTP DDTP
Deputy Municipal Commissioner
-
22/12/2022
1
8
0
NA
NA
NA
NA
NA
Forwarded
6
Municipal Commissioner
Municipal Commissioner
-
-
1
8
0
NA
NA
NA
NA
NA
NA
Pending
Full Occupancy Insepction Report Detail
Sr No.
Authority
Designation
Site Visited Date
Visit Start Time
Visit End Time
Site Inspection Report
1
mitali dhangar
Junior Engineer
21/12/2022
05:30 pm
06:00 pm
View pdf
Close
Top