7094
:
RVVCMC202200014
:
Tejas Madhukar Patil
:
:
14/06/2022
:
VVCMC-22-00441
:
Residential
:
500
:
A
:
naigaon
:
VVCMC/RB/2022/APL/00002
:
14/06/2022
:
:
VASAI
:
11
:
10/PT
:
0
:
1.10
:
500
Existing Building Permission Details
BUILDING NO 1
Residential
flats
171.67 Sq. mt.
0
3
1
0.00
0.60
171.67 Sq. mt.
0.00 Sq. mt.
0.00 Sq. mt.
0.00
0.00
9.15
No
 
No
 
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor UseParking FloorGround FloorStilt FloorFloor Height(Below Ground Level(Meter))Basement FloorRe-Creation FloorService FloorPodium FloorTerrace FloorStep MarginSpecify Floors With Identical Plan And BUA Polyline
GROUND FLOOR2.850.603.4559.15ResidentialNoNoYes0.000.00ResidentialNoNoNo0.000
TYPICAL FIRST AND SECOND FLOOR2.853.456.3056.26ResidentialNoNoYes0.000.00ResidentialNoNoNo0.000
TYPICAL FIRST AND SECOND FLOOR2.856.309.1556.26ResidentialNoNoYes0.000.00ResidentialNoNoNo0.000
Revised Building Permission Details
BUILDING NO 1
Residential
flats
227.93 Sq. mt.
0
4
1
0.00
0.60
227.93 Sq. mt.
0.00 Sq. mt.
0.00 Sq. mt.
0.00
0.00
12.00
Yes
 
No
 
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor UseParking FloorGround FloorStilt FloorFloor Height(Below Ground Level(Meter))Basement FloorRe-Creation FloorService FloorPodium FloorTerrace FloorStep MarginSpecify Floors With Identical Plan And BUA Polyline
GROUND FLOOR2.850.603.4559.15ResidentialNoNoYes0.000.00ResidentialNoNoNo0.000
TYPICAL FIRST AND THIRD FLOOR2.853.456.3056.26ResidentialNoNoYes0.000.00ResidentialNoNoNo0.000
TYPICAL FIRST AND THIRD FLOOR2.856.309.1556.26ResidentialNoNoYes0.000.00ResidentialNoNoNo0.000
TYPICAL FIRST AND THIRD FLOOR2.859.1512.0056.26ResidentialNoNoYes0.000.00ResidentialNoNoNo0.000
 
 
Done
Pending
Reject
Engineer
Pending
Approved
Service Name : Revised Building Permission
Steps No. Authority / ApplicantDesignationApplication Received DateApplication Forward/Approve DateDuration(In Days)Expected Completion DaysDelay(In Days)Project Verified By TechnicalPre Approval PaymentDocument VerificationSite InspectionPost Approval Payment VerificationPost Approval PaymentArchitect Digital Signature StatusCertificate IssuedStatus / ActionRemark
1ROHINI THAKAREEngineer14/06/2022-160NANANANANANANAForwarded-
2mitali dhangarJunior Engineer-14/06/20221300NANANANANANANANAForwarded
3DDTP DDTPDeputy Municipal Commissioner-14/06/20221300NANANANANANANANAForwarded
4Municipal CommissionerMunicipal Commissioner-14/06/20221300NANANANANANANANAApproved
5ROHINI THAKAREEngineer14/06/2022-160NANANANANANAForwarded-
6Municipal CommissionerMunicipal Commissioner-14/06/20221915800NANANANANANANAApproved
Revised Building Permission Insepction Report Detail
Sr No.AuthorityDesignationSite Visited DateVisit Start TimeVisit End TimeSite Inspection Report
1mitali dhangarJunior Engineer14/06/202212:30 pm02:30 pmView pdf