BUILDING PLAN MANAGEMENT SYSTEM

By Urban Development Department

\ Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:- https://shorturl.at/hGZ37
:
7090
:
RVVCMC202200012
:
Tejas Madhukar Patil
:
:
13/06/2022
:
VVCMC-22-00439
:
Residential
:
500
:
A
:
naigaon
:
:
VASAI
:
11
:
10/PT
:
0
:
1.1
:
500
Existing Building Permission Details
BUILDING NO 1
Residential
flats
115.41 Sq. mt.
0
2
1
0.00
0.60
115.41 Sq. mt.
0.00 Sq. mt.
0.00 Sq. mt.
0.00
0.00
6.30
Yes
 
No
 
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor UseParking FloorGround FloorStilt FloorFloor Height(Below Ground Level(Meter))Basement FloorRe-Creation FloorService FloorPodium FloorTerrace FloorStep MarginSpecify Floors With Identical Plan And BUA Polyline
GROUND FLOOR2.850.603.4559.15ResidentialNoYesYes0.000.00ResidentialNoNoNo0.000
FIRST FLOOR2.853.456.3056.26ResidentialNoNoYes0.000.00ResidentialNoNoNo0.000
Revised Building Permission Details
BUILDING NO 1
Residential
flats
546.25 Sq. mt.
0
3
1
0.00
0.60
546.25 Sq. mt.
0.00 Sq. mt.
0.00 Sq. mt.
0.00
0.00
9.15
Yes
 
No
 
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor UseParking FloorGround FloorStilt FloorFloor Height(Below Ground Level(Meter))Basement FloorRe-Creation FloorService FloorPodium FloorTerrace FloorStep MarginSpecify Floors With Identical Plan And BUA Polyline
EX GROUND FLOOR2.850.603.450.00ResidentialNoYesYes0.000.00ResidentialNoNoNo0.000
EX FIRST FLOOR2.853.456.300.00ResidentialNoNoYes0.000.00ResidentialNoNoNo0.000
PR SECOND FLOOR2.856.309.15546.25ResidentialNoNoYes0.000.00ResidentialNoNoNo0.000
 
 
Done
Pending
Reject
Architect
Pending
Approved
Service Name : Revised Building Permission
Steps No. Authority / ApplicantDesignationApplication Received DateApplication Forward/Approve DateDuration(In Days)Expected Completion DaysDelay(In Days)Project Verified By TechnicalPre Approval PaymentDocument VerificationSite InspectionPost Approval Payment VerificationPost Approval PaymentArchitect Digital Signature StatusCertificate IssuedStatus / ActionRemark
1TEJ PATILArchitect13/06/2022-160NANANANANANANAForwarded-
2mitali dhangarJunior Engineer-13/06/20221300NANANANANANANANAForwarded
3TEJ PATILArchitect13/06/202213/06/2022160NANANANANAForwardedNA
4mitali dhangarJunior Engineer13/06/202213/06/20221300NANANANANANAForwarded
5DDTP DDTPDeputy Municipal Commissioner-13/06/20221300NANANANANANANANAForwarded
6Municipal CommissionerMunicipal Commissioner-08/07/20221300NANANANANANANANAForwarded
7TEJ PATILArchitect08/07/2022-160NANANANANAProposal Resubmit PendingNA
8DDTP DDTPDeputy Municipal Commissioner-08/07/20221300NANANANANANANANAForwarded
9Municipal CommissionerMunicipal Commissioner-08/07/20221300NANANANANANANANAProposal Reassign
10TEJ PATILArchitect08/07/2022-160NANANANANAProposal Resubmit PendingNA
Revised Building Permission Insepction Report Detail
Sr No.AuthorityDesignationSite Visited DateVisit Start TimeVisit End TimeSite Inspection Report
1mitali dhangarJunior Engineer13/06/202201:00 pm03:00 pmView pdf