Toggle navigation
Home
मराठी
User Guide
Presentations
Manuals
FAQs
FAQs - TP-Client(Drawing)
Application(Online)
FAQs - Operational Issue
FAQs - Payment Issue
FAQs - Others Issue
Do's and Don'ts
UDCPR
Circular
Patch
Login
BUILDING PLAN MANAGEMENT SYSTEM
By Urban Development Department
\
Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:-
https://shorturl.at/hGZ37
Proposal Status for Revised Building Permission
Proposal No
:
7033
Application No
:
RVVCMC202200005
Owner Name
:
Bhushan Babulal Kardiwal
Additional Owner List
:
View
×
Additional Owner List
Sr No
Name
Address
Mobile No
Email
No result Found
Proposal Date
:
24/02/2022
Proposal Code
:
VVCMC-22-ENTRY-00286
Proposal Type
:
Mixed
Proposal Plot Area
:
600
TDR Zone
:
A
Site Area
:
naigaon
Existing Building Permission Details
:
View
Site Details
Site Address
:
VIRAR
Site Location
:
11
Survey Number
:
10/PT
Plot Number
:
4
Premium FSI
:
1.10
Plot Area
:
600
Building and Floor Details
Existing Building Permission Details
Building Type :
IMPERIA
Building Category :
Residential
Sub Category :
flats
Total Built Up Area :
600 Sq. mt.
No.of Tenements :
0
No. of Levels :
6
No. of Buildings :
1
Basement Height(m) :
0.45
Plinth Level(m) :
0.45
Residential Built Up Area :
600.00 Sq. mt.
Commercial Built Up Area :
0.00 Sq. mt.
Industrial Built Up Area :
0.00 Sq. mt.
Educational Buildup Area :
0.00
Institutional Buildup Area :
0.00
Building Height :
0.00
Plinth Intimation Taken :
Yes
Part Occupancy Taken :
Yes
Floor Details
Floor Name
Floor Height(m)
Bottom Level
Top Level
Floor Area
Floor Use
Parking Floor
Ground Floor
Stilt Floor
Floor Height(Below Ground Level(Meter))
Basement Floor
Re-Creation Floor
Service Floor
Podium Floor
Terrace Floor
Step Margin
Specify Floors With Identical Plan And BUA Polyline
Revised Building Permission Details
Building Type :
IMPERIA
Building Category :
Mixed
Sub Category :
Mixed
Total Built Up Area :
940.01 Sq. mt.
No.of Tenements :
0
No. of Levels :
5
No. of Buildings :
1
Basement Height(m) :
0.00
Plinth Level(m) :
0.45
Residential Built Up Area :
847.32 Sq. mt.
Commercial Built Up Area :
92.69 Sq. mt.
Industrial Built Up Area :
0.00 Sq. mt.
Educational Buildup Area :
0.00
Institutional Buildup Area :
0.00
Building Height :
15.51
Plinth Intimation Taken :
No
Part Occupancy Taken :
No
Floor Details
Floor Name
Floor Height(m)
Bottom Level
Top Level
Floor Area
Floor Use
Parking Floor
Ground Floor
Stilt Floor
Floor Height(Below Ground Level(Meter))
Basement Floor
Re-Creation Floor
Service Floor
Podium Floor
Terrace Floor
Step Margin
Specify Floors With Identical Plan And BUA Polyline
GF
3.50
0.45
3.95
92.69
Commercial
No
Yes
Yes
0.00
0.00
Commercial
No
No
No
0.00
0
TYPICAL FIRST TO FOURTH
2.89
3.95
6.84
211.83
Residential
No
No
Yes
0.00
0.00
Residential
No
No
No
0.00
0
TYPICAL FIRST TO FOURTH
2.89
6.84
9.73
211.83
Residential
No
No
Yes
0.00
0.00
Residential
No
No
No
0.00
0
TYPICAL FIRST TO FOURTH
2.89
9.73
12.62
211.83
Residential
No
No
Yes
0.00
0.00
Residential
No
No
No
0.00
0
TYPICAL FIRST TO FOURTH
2.89
12.62
15.51
211.83
Residential
No
No
Yes
0.00
0.00
Residential
No
No
No
0.00
0
Proposal Timeline Details
Done
Pending
Reject
Architect
Pending
Approved
Service Name
: Revised Building Permission
Steps No.
Authority / Applicant
Designation
Application Received Date
Application Forward/Approve Date
Duration(In Days)
Expected Completion Days
Delay(In Days)
Project Verified By Technical
Pre Approval Payment
Document Verification
Site Inspection
Post Approval Payment Verification
Post Approval Payment
Architect Digital Signature Status
Certificate Issued
Status / Action
Remark
1
tejas patil
Architect
24/02/2022
-
1
6
0
NA
NA
NA
NA
NA
NA
NA
Forwarded
-
2
mitali dhangar
Junior Engineer
-
24/02/2022
1
30
0
NA
NA
NA
NA
NA
NA
NA
NA
Forwarded
3
DDTP DDTP
Deputy Municipal Commissioner
-
24/02/2022
1
30
0
NA
NA
NA
NA
NA
NA
NA
NA
Forwarded
4
Municipal Commissioner
Municipal Commissioner
-
24/02/2022
1
30
0
NA
NA
NA
NA
NA
NA
NA
NA
Approved
5
tejas patil
Architect
24/02/2022
-
1
6
0
NA
NA
NA
NA
NA
NA
Pending
-
Revised Building Permission Insepction Report Detail
Sr No.
Authority
Designation
Site Visited Date
Visit Start Time
Visit End Time
Site Inspection Report
1
mitali dhangar
Junior Engineer
24/02/2022
01:00 pm
03:00 pm
View pdf
2
DDTP DDTP
Deputy Municipal Commissioner
25/02/2022
08:00 am
10:00 am
View pdf
Close
Top