Toggle navigation
Home
मराठी
User Guide
Presentations
Manuals
FAQs
FAQs - TP-Client(Drawing)
Application(Online)
FAQs - Operational Issue
FAQs - Payment Issue
FAQs - Others Issue
Do's and Don'ts
UDCPR
Circular
Patch
Login
BUILDING PLAN MANAGEMENT SYSTEM
By Urban Development Department
\
Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:-
https://shorturl.at/hGZ37
Proposal Status for Part Occupancy
Proposal No
:
7027
Application No
:
BNMC/2022/7027/1875
Owner Name
:
AMOL AMZIRE
Additional Owner List
:
View
×
Additional Owner List
Sr No
Name
Address
Mobile No
Email
No result Found
Proposal Date
:
01/12/2021
Proposal Code
:
BNMC-22-ENTRY-00287
Proposal Type
:
Residential
Proposal Plot Area
:
100
TDR Zone
:
Site Area
:
CHAVINDRA
Site Details
Site Address
:
BNMC
Site Location
:
Municipal Corporation
Survey Number
:
Plot Number
:
2022
Premium FSI
:
00
Plot Area
:
100
Building and Floor Details
Building Name :
A WING
Building Category :
Residential
Sub Category :
flats
Total Built Up Area :
80 Sq. mt.
No.of Tenements :
0
No. of Levels :
1
No. of Buildings :
1
Basement Height(m) :
0.45
Plinth Level(m) :
0.45
Residential Built Up Area :
80.00 Sq. mt.
Commercial Built Up Area :
0.00 Sq. mt.
Industrial Built Up Area :
0.00 Sq. mt.
Educational Buildup Area :
0.00
Institutional Buildup Area :
0.00
Building Height :
4.10
Plinth Intimation Taken :
Yes
Part Occupancy Taken :
No
Floor Details
Floor Name
Floor Height(m)
Bottom Level
Top Level
Floor Area
Floor use
Parking Floor
Ground Floor
Stilt Floor
Ex - Floor Area
Floor Used Area
Floor Usage
Part OC Taken Or Not
Typical Floor
Part Oc Applied Yes /No
Part Oc Applied Area
Proposal Timeline Details
Done
Pending
Reject
Pending
Approved
Service Name
: Part Occupancy
Steps No.
Authority / Applicant
Designation
Application Received Date
Application Forward/Approve Date
Duration(In Days)
Expected Completion Days
Delay(In Days)
Project Verified By Technical
Pre Approval Payment
Document Verification
Site Inspection
Post Approval Payment Verification
Post Approval Payment
Architect Digital Signature Status
Certificate Issued
Status / Action
Remark
1
22/02/2022
22/02/2022
1
6
0
NA
NA
NA
NA
NA
NA
NA
NA
Forwarded
2
Ejaz Ghori
Junior Engineer
-
22/02/2022
1
8
0
NA
NA
NA
NA
NA
Forwarded
3
ANIL Yelmame
Assistant Director of Town Planning / Additional Director of Town Planning
-
22/02/2022
1
8
0
NA
NA
NA
NA
NA
NA
Forwarded
4
VIJAYKUMAR MHASAL
Municipal Commissioner
-
22/02/2022
1
8
0
NA
NA
NA
NA
NA
NA
Approved
5
AVINASH CHAVHAN
Junior Engineer
22/02/2022
-
1
NA
NA
NA
NA
NA
NA
NA
NA
NA
Forwarded
NA
6
22/02/2022
22/02/2022
2
6
0
NA
NA
NA
NA
NA
NA
NA
Done
Payment done by Architect payment verification is pending from first authority
Part Occupancy Insepction Report Detail
Sr No.
Authority
Designation
Site Visited Date
Visit Start Time
Visit End Time
Site Inspection Report
1
Ejaz Ghori
Junior Engineer
22/02/2022
01:00 pm
02:00 pm
View pdf
Close
Top