BUILDING PLAN MANAGEMENT SYSTEM

By Urban Development Department

\ Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:- https://shorturl.at/hGZ37
:
7481
:
RNAMRDA202400003
:
Rushikesh Adinath Dhole
:
:
09/05/2024
:
NAMRDA-24-00173
:
Residential
:
155.89
:
A
:
NI Aahergaon 5 जिरायत शेत जमिन 0-1.25
:
:
e
:
6
:
100
:
1
:
0.20
:
155.89
Existing Building Permission Details
BUILDING1
Residential
flats
7593.2 Sq. mt.
0
2
1
0.00
0.14
7593.20 Sq. mt.
0.00 Sq. mt.
0.00 Sq. mt.
0.00
0.00
4.94
No
 
No
 
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor UseParking FloorGround FloorStilt FloorFloor Height(Below Ground Level(Meter))Basement FloorRe-Creation FloorService FloorPodium FloorTerrace FloorStep MarginSpecify Floors With Identical Plan And BUA Polyline
GF2.400.142.543796.60ResidentialNoYesYes0.000.00ResidentialNoNoNo0.000
1ST2.402.544.943796.60ResidentialNoNoYes0.000.00ResidentialNoNoNo0.000
Revised Building Permission Details
BUILDING1
Residential
flats
58.31 Sq. mt.
0
2
1
0.00
0.14
58.31 Sq. mt.
0.00 Sq. mt.
0.00 Sq. mt.
0.00
0.00
4.94
No
 
No
 
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor UseParking FloorGround FloorStilt FloorFloor Height(Below Ground Level(Meter))Basement FloorRe-Creation FloorService FloorPodium FloorTerrace FloorStep MarginSpecify Floors With Identical Plan And BUA Polyline
 
 
Done
Pending
Reject
Architect
Pending
Approved
Service Name : Revised Building Permission
Steps No. Authority / ApplicantDesignationApplication Received DateApplication Forward/Approve DateDuration(In Days)Expected Completion DaysDelay(In Days)Project Verified By TechnicalPre Approval PaymentDocument VerificationSite InspectionPost Approval Payment VerificationPost Approval PaymentArchitect Digital Signature StatusCertificate IssuedStatus / ActionRemark
1Rohit MhapankarArchitect09/05/2024-160NANANANANANAPending-