BUILDING PLAN MANAGEMENT SYSTEM

By Urban Development Department

\ Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:- https://shorturl.at/hGZ37
:
6380
:
CABBC202100020
:
Akshay Babasaheb Zirpe
:
:
31/05/2021
:
CABBC-21-01827
:
Residential
:
276
:
A
:
1.21-कॅनाल रोड ते न.प.हद्दीपर्यत - तरफ गिराम
:
At Beed
:
1
:
49584
:
11
:
1.10
:
276
RESIDENTIAL
Residential
apartment houses
546.49 Sq. mt.
0
5
1
0.00
0.90
546.49 Sq. mt.
0.00 Sq. mt.
0.00 Sq. mt.
 
0.00
0.00
15.65
No
 
No
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor useParking FloorGround FloorStilt FloorEx - Floor Area Floor Used Area Floor Usage Part OC Taken Or Not Typical Floor Part Oc Applied Yes /No Part Oc Applied Area
PARKING FLOOR2.750.903.650.00ResidentialYesNoYes0.000.00ResidentialNoNoNo0
TYPICAL FRIST SCOND THIRD FORTH FLOOR3.003.656.65546.49ResidentialNoNoYes0.000.00ResidentialNoNoNo0
TYPICAL FRIST SCOND THIRD FORTH FLOOR3.006.659.65546.49ResidentialNoNoYes0.000.00ResidentialNoNoNo0
TYPICAL FRIST SCOND THIRD FORTH FLOOR3.009.6512.65546.49ResidentialNoNoYes0.000.00ResidentialNoNoNo0
TYPICAL FRIST SCOND THIRD FORTH FLOOR3.0012.6515.65546.49ResidentialNoNoYes0.000.00ResidentialNoNoNo0
 
 
Done
Pending
Reject
Engineer
Pending
Approved
Service Name : Building Permission
Steps No. Authority / ApplicantDesignationApplication Received DateApplication Forward/Approve DateDuration(In Days)Expected Completion DaysDelay(In Days)Project Verified By TechnicalPre Approval PaymentDocument VerificationSite InspectionPost Approval Payment VerificationPost Approval PaymentArchitect Digital Signature StatusCertificate IssuedStatus / ActionRemark
1Akshay ZirpeEngineer31/05/202131/05/2021160NANANANANANAForwarded-
2Ashutosh KawalkarAssistant Town Planner--100NANANANANAPending
Building Permission Insepction Report Detail
Sr No.AuthorityDesignationSite Visited DateVisit Start TimeVisit End TimeSite Inspection Report
1Ashutosh KawalkarAssistant Town Planner31/05/202104:30 pm06:30 pmView pdf