BUILDING PLAN MANAGEMENT SYSTEM
By Urban Development Department
\
Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:-
https://shorturl.at/hGZ37
Proposal Status for Building Permission
Proposal No
:
6352
Application No
:
CAWRM202100021
Owner Name
:
Bipin Ashokrao Gotekar
Additional Owner List
:
View
×
Additional Owner List
Sr No
Name
Address
Mobile No
Email
No result Found
Proposal Date
:
27/05/2021
Proposal Code
:
CAWRM-21-01785
Proposal Type
:
Commercial
Proposal Plot Area
:
724.85
TDR Zone
:
A
Site Area
:
1.21-सेवागà¥à¤°à¤¾à¤® मारà¥à¤—ावरील -टी- जंकà¥à¤¶à¤¨ ते टिळक मारà¥à¤•à¥‡à¤Ÿ ते नागपà¥à¤° मारà¥à¤— (इंगोले चौक ) नà¤à¥à¤² शिट कà¥à¤°à¤‚. 14
Site Details
Site Address
:
Survey No. 3868, Sheet No. 71, Mauza No. 429
Site Location
:
1
Survey Number
:
14/105
Plot Number
:
3868
Premium FSI
:
1.100
Plot Area
:
724.85
Building and Floor Details
Building Name :
EDUCATIONAL
Building Category :
Educational
Sub Category :
educational institution
Total Built Up Area :
1578.74 Sq. mt.
No.of Tenements :
0
No. of Levels :
2
No. of Buildings :
1
Basement Height(m) :
0.00
Plinth Level(m) :
0.60
Residential Built Up Area :
789.37 Sq. mt.
Commercial Built Up Area :
789.37 Sq. mt.
Industrial Built Up Area :
0.00 Sq. mt.
Educational Buildup Area :
0.00
Institutional Buildup Area :
0.00
Building Height :
3.90
Plinth Intimation Taken :
No
Part Occupancy Taken :
No
Floor Details
Floor Name
Floor Height(m)
Bottom Level
Top Level
Floor Area
Floor use
Parking Floor
Ground Floor
Stilt Floor
Ex - Floor Area
Floor Used Area
Floor Usage
Part OC Taken Or Not
Typical Floor
Part Oc Applied Yes /No
Part Oc Applied Area
Proposal Timeline Details
Done
Pending
Reject
Structural Engineer
Pending
Approved
Service Name
: Building Permission
Steps No.
Authority / Applicant
Designation
Application Received Date
Application Forward/Approve Date
Duration(In Days)
Expected Completion Days
Delay(In Days)
Project Verified By Technical
Pre Approval Payment
Document Verification
Site Inspection
Post Approval Payment Verification
Post Approval Payment
concession and relaxation
Architect Digital Signature Status
Certificate Issued
Status / Action
Remark
1
Ganesh Patil
Structural Engineer
27/05/2021
27/05/2021
1
6
0
NA
NA
NA
NA
NA
NA
NA
Forwarded
-
2
Adishri Dhondrikar
Assistant Town Planner
27/05/2021
27/05/2021
0
0
0
NA
NA
NA
NA
NA
NA
NA
NA
Forwarded
3
Shantanu Dewaikar
Planning Assistant
-
-
1
0
0
NA
NA
NA
NA
NA
NA
NA
Pending
Building Permission Insepction Report Detail
Sr No.
Authority
Designation
Site Visited Date
Visit Start Time
Visit End Time
Site Inspection Report
1
Shantanu Dewaikar
Planning Assistant
27/05/2021
08:30 am
10:30 am
View pdf
Close
Top