BUILDING PLAN MANAGEMENT SYSTEM

By Urban Development Department

\ Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:- https://shorturl.at/hGZ37
:
6293
:
RTMCB202100232
:
xyz
:
:
14/05/2021
:
TMCB-21-00969
:
Residential
:
140
:
A
:
2A/2) All Survey Number on Both Sides of Ghodbunder Road and Majiwada Village Portion between (Kolshet and Borikade).
:
TMCB/RB/2021/APL/00001
:
14/05/2021
:
:
:
12
:
324
:
1
:
1.1
:
140
Existing Building Permission Details
RESIDENTIAL
Residential
normal residential
143 Sq. mt.
0
2
1
0.00
0.45
143.00 Sq. mt.
0.00 Sq. mt.
0.00 Sq. mt.
0.00
0.00
7.45
No
 
No
 
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor UseParking FloorGround FloorStilt FloorFloor Height(Below Ground Level(Meter))Basement FloorRe-Creation FloorService FloorPodium FloorTerrace FloorStep MarginSpecify Floors With Identical Plan And BUA Polyline
GF3.500.453.9571.50ResidentialNoYesYes0.000.00ResidentialNoNoNo0.000
FF3.503.957.4571.50ResidentialNoNoYes0.000.00ResidentialNoNoNo0.000
Revised Building Permission Details
RESIDENTIAL
Residential
normal residential
214.5 Sq. mt.
0
3
1
0.00
0.45
214.50 Sq. mt.
0.00 Sq. mt.
0.00 Sq. mt.
0.00
0.00
10.95
Yes
 
No
 
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor UseParking FloorGround FloorStilt FloorFloor Height(Below Ground Level(Meter))Basement FloorRe-Creation FloorService FloorPodium FloorTerrace FloorStep MarginSpecify Floors With Identical Plan And BUA Polyline
GF3.500.453.9571.50ResidentialNoYesYes71.500.00ResidentialNoNoNo71.500
FF3.503.957.4571.50ResidentialNoNoYes71.500.00ResidentialNoNoNo71.500
SF3.507.4510.9571.50ResidentialNoNoYes0.000.00ResidentialNoNoNo0.000
 
 
Done
Pending
Reject
Architect
Pending
Approved
Service Name : Revised Building Permission
Steps No. Authority / ApplicantDesignationApplication Received DateApplication Forward/Approve DateDuration(In Days)Expected Completion DaysDelay(In Days)Project Verified By TechnicalPre Approval PaymentDocument VerificationSite InspectionPost Approval Payment VerificationPost Approval PaymentArchitect Digital Signature StatusCertificate IssuedStatus / ActionRemark
1test firstArchitect14/05/2021-160NANANANANANAPending-
2test firstArchitect14/05/2021-160NANANANANANAForwarded-
3Ramkrushna KolheExecutive Engineer-30/05/20211877800NANANANANANANAApproved
Revised Building Permission Insepction Report Detail
Sr No.AuthorityDesignationSite Visited DateVisit Start TimeVisit End TimeSite Inspection Report
1Mangesh ShelarSurveyor14/05/202106:16 pm06:17 pmView pdf
2Mahesh RawalDeputy Engineer14/05/202106:19 pm06:20 pm