6273
:
RDDMCO202100011
:
Paresh Krushnarao Burghate
:
:
10/05/2021
:
DDMCO-21-01573
:
Mixed
:
235.62
:
A
:
1.10-खोलेश्वर विद्यालय ते मांडवा रस्ता
:
:
AKOLA
:
4
:
85
:
6/1
:
1.10
:
235.62
Existing Building Permission Details
MIX
Mixed
Mixed
169.96 Sq. mt.
0
2
1
0.00
0.90
84.98 Sq. mt.
84.98 Sq. mt.
0.00 Sq. mt.
0.00
0.00
6.90
Yes
 
No
 
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor UseParking FloorGround FloorStilt FloorFloor Height(Below Ground Level(Meter))Basement FloorRe-Creation FloorService FloorPodium FloorTerrace FloorStep MarginSpecify Floors With Identical Plan And BUA Polyline
GF3.000.903.900.00CommercialNoYesYes0.000.00CommercialNoNo0.000
FF3.003.906.9084.98ResidentialNoNoYes0.000.00ResidentialNoNoNo0.000
Revised Building Permission Details
MIX
Mixed
Mixed
84.98 Sq. mt.
0
3
1
0.00
0.90
84.98 Sq. mt.
0.00 Sq. mt.
0.00 Sq. mt.
0.00
0.00
9.90
Yes
 
No
 
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor UseParking FloorGround FloorStilt FloorFloor Height(Below Ground Level(Meter))Basement FloorRe-Creation FloorService FloorPodium FloorTerrace FloorStep MarginSpecify Floors With Identical Plan And BUA Polyline
GF3.000.903.900.00CommercialNoYesYes0.000.00CommercialNoNoNo0.000
FF3.003.906.900.00ResidentialNoNoYes84.980.00ResidentialNoNoNo84.980
SF3.006.909.9084.98ResidentialNoNoYes0.000.00ResidentialNoNoNo0.000
 
 
Done
Pending
Reject
Engineer
Pending
Approved
Service Name : Revised Building Permission
Steps No. Authority / ApplicantDesignationApplication Received DateApplication Forward/Approve DateDuration(In Days)Expected Completion DaysDelay(In Days)Project Verified By TechnicalPre Approval PaymentDocument VerificationSite InspectionPost Approval Payment VerificationPost Approval PaymentArchitect Digital Signature StatusCertificate IssuedStatus / ActionRemark
1Paresh BurghateEngineer10/05/2021-160NANANANANANANAForwarded-
2Laxmikant BangarJunior Engineer10/05/2021-000NANANANANANANAForwarded
3MANOJ GHATOLKARJunior Engineer-13/05/20211300NANANANANANAForwarded
4SANJAY NAKODTown Planner-14/05/20211300NANANANANANANANAApproved
5Paresh BurghateEngineer13/05/2021-160NANANANANANAPending-
Revised Building Permission Insepction Report Detail
Sr No.AuthorityDesignationSite Visited DateVisit Start TimeVisit End TimeSite Inspection Report
1MANOJ GHATOLKARJunior Engineer13/05/202106:00 pm08:00 pmView pdf