BUILDING PLAN MANAGEMENT SYSTEM

By Urban Development Department

\ Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:- https://shorturl.at/hGZ37
:
6067
:
TMCB202100183
:
Akshay Gaikwad
:
:
01/04/2021
:
TMCB-21-01323
:
Mixed
:
434.48
:
A
:
2A/2) All Survey Number on Both Sides of Ghodbunder Road and Majiwada Village Portion between (Kolshet and Borikade).
:
TMCB/B/2021/APL/00083
:
01/04/2021
:
:
12
:
1131696
:
24
:
1.10
:
434.48
MIXED
Mixed
Mixed
71.86 Sq. mt.
0
4
1
0.00
0.45
27.66 Sq. mt.
44.20 Sq. mt.
0.00 Sq. mt.
 
0.00
0.00
12.25
Yes
 
No
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor useParking FloorGround FloorStilt FloorEx - Floor Area Floor Used Area Floor Usage Part OC Taken Or Not Typical Floor Part Oc Applied Yes /No Part Oc Applied Area
GROUND PLUS STILT FLOOR2.950.453.4027.66MixedNoYesYes0.000.00MixedNoNo0
FIRST FLOOR2.953.406.350.00ResidentialNoNoYes0.000.00ResidentialNoNoNo0
SECOND FLOOR2.956.359.300.00ResidentialNoNoYes0.000.00ResidentialNoNoNo0
THIRD FLOOR2.959.3012.250.00ResidentialNoNoYes0.000.00ResidentialNoNoNo0
 
 
Done
Pending
Reject
Architect
Pending
Approved
Service Name : Building Permission
Steps No. Authority / ApplicantDesignationApplication Received DateApplication Forward/Approve DateDuration(In Days)Expected Completion DaysDelay(In Days)Project Verified By TechnicalPre Approval PaymentDocument VerificationSite InspectionPost Approval Payment VerificationPost Approval PaymentArchitect Digital Signature StatusCertificate IssuedStatus / ActionRemark
1test firstArchitect01/04/202101/04/2021160NANANANANANAForwarded-
2Annasaheb SonandkarJunior Engineer01/04/202101/04/2021000NANANANANANANAForwarded
3Shrinivas RautSurveyor01/04/202101/04/2021000NANANANANANANAForwarded
4Deepak JagtapDeputy Engineer01/04/202101/04/2021000NANANANANANANAForwarded
5Junior EngineerJunior Engineer-01/04/20211300NANANANANANANANAForwarded
6Municipal CommissionerMunicipal Commissioner-01/04/20211300NANANANANANANANAApproved
7test firstArchitect01/04/2021-160NANANANANANAForwarded-
8Municipal CommissionerMunicipal Commissioner-01/04/20211871900NANANANANANANAApproved
Building Permission Insepction Report Detail
Sr No.AuthorityDesignationSite Visited DateVisit Start TimeVisit End TimeSite Inspection Report
1Junior EngineerJunior Engineer01/04/202106:00 pm06:30 pmView pdf