BUILDING PLAN MANAGEMENT SYSTEM

By Urban Development Department

\ Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:- https://shorturl.at/hGZ37
:
6043
:
NMCB202100005
:
ANIL BIJALPURE
:
:
30/03/2021
:
NMCB-21-01027
:
Residential
:
231
:
A
:
1.9 - भुभाग - वर दिलेले 1.4 ते 1.8 पर्यतच्या रस्ता उपविभागातील मिळकती वगळता इतर अंर्तगत - रहिवास व तत्सम विभागातील मिळकती
:
:
12
:
1176600
:
3
:
1.10
:
231
RESIDENTIAL
Residential
multi-family dwellings
436.47 Sq. mt.
0
5
1
0.00
0.60
436.47 Sq. mt.
0.00 Sq. mt.
0.00 Sq. mt.
 
0.00
0.00
14.60
No
 
No
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor useParking FloorGround FloorStilt FloorEx - Floor Area Floor Used Area Floor Usage Part OC Taken Or Not Typical Floor Part Oc Applied Yes /No Part Oc Applied Area
GROUND FLOOR2.800.603.4014.39ResidentialNoYesYes0.000.00ResidentialNoNoNo0
FIRST SECOND THIRD FOURTH FLOOR2.803.406.20422.09ResidentialNoNoYes0.000.00ResidentialNoNoNo0
FIRST SECOND THIRD FOURTH FLOOR2.806.209.00422.09ResidentialNoNoYes0.000.00ResidentialNoNoNo0
FIRST SECOND THIRD FOURTH FLOOR2.809.0011.80422.09ResidentialNoNoYes0.000.00ResidentialNoNoNo0
FIRST SECOND THIRD FOURTH FLOOR2.8011.8014.60422.09ResidentialNoNoYes0.000.00ResidentialNoNoNo0
 
 
Done
Pending
Reject
Architect
Pending
Approved
Service Name : Building Permission
Steps No. Authority / ApplicantDesignationApplication Received DateApplication Forward/Approve DateDuration(In Days)Expected Completion DaysDelay(In Days)Project Verified By TechnicalPre Approval PaymentDocument VerificationSite InspectionPost Approval Payment VerificationPost Approval PaymentArchitect Digital Signature StatusCertificate IssuedStatus / ActionRemark
1Dheeraj DalviArchitect30/03/202130/03/2021160NANANANANANAForwarded-
2Hemant PatheJunior Engineer-04/04/20211300NANANANANANANANAForwarded
3Sandesh ShindeDeputy Engineer-04/04/20211300NANANANANANANANAForwarded
4Ankush SonkambaleAssistant Director Town Planning-04/04/20211300NANANANANANANANAApproved
5Dheeraj DalviArchitect04/04/2021-160NANANANANANAPending-
Building Permission Insepction Report Detail
Sr No.AuthorityDesignationSite Visited DateVisit Start TimeVisit End TimeSite Inspection Report
1Hemant PatheJunior Engineer30/03/202108:00 am08:30 amView pdf