Toggle navigation
Home
मराठी
User Guide
Presentations
Manuals
FAQs
FAQs - TP-Client(Drawing)
Application(Online)
FAQs - Operational Issue
FAQs - Payment Issue
FAQs - Others Issue
Do's and Don'ts
UDCPR
Circular
Patch
Login
BUILDING PLAN MANAGEMENT SYSTEM
By Urban Development Department
\
Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:-
https://shorturl.at/hGZ37
Proposal Status for Building Permission
Proposal No
:
6016
Application No
:
NMO202100011
Owner Name
:
Priyanka Arul Mohan
Additional Owner List
:
View
×
Additional Owner List
Sr No
Name
Address
Mobile No
Email
Proposal Date
:
26/03/2021
Proposal Code
:
NMO-21-01160
Proposal Type
:
Residential
Proposal Plot Area
:
100
TDR Zone
:
A
Site Area
:
57/1141 , 57/918 , 57/1144 , 57/1160 , 57/917 , 57/1140 , 57/1142 , 57/1143 , 57/1157 , 57/1158 , 57/1159 , 57/912 , 57/999 , 57/1212 , 57/1139
Site Details
Site Address
:
Site Location
:
5
Survey Number
:
1177380
Plot Number
:
100
Premium FSI
:
0.75
Plot Area
:
100
Building and Floor Details
Building Name :
PRIYANKA ARUL MOHAN
Building Category :
Residential
Sub Category :
normal residential
Total Built Up Area :
48.04 Sq. mt.
No.of Tenements :
0
No. of Levels :
1
No. of Buildings :
1
Basement Height(m) :
0.00
Plinth Level(m) :
0.60
Residential Built Up Area :
48.04 Sq. mt.
Commercial Built Up Area :
0.00 Sq. mt.
Industrial Built Up Area :
0.00 Sq. mt.
Educational Buildup Area :
0.00
Institutional Buildup Area :
0.00
Building Height :
3.60
Plinth Intimation Taken :
No
Part Occupancy Taken :
No
Floor Details
Floor Name
Floor Height(m)
Bottom Level
Top Level
Floor Area
Floor use
Parking Floor
Ground Floor
Stilt Floor
Ex - Floor Area
Floor Used Area
Floor Usage
Part OC Taken Or Not
Typical Floor
Part Oc Applied Yes /No
Part Oc Applied Area
GROUND
3.00
0.60
3.60
48.04
Residential
No
Yes
Yes
0.00
0.00
Residential
No
No
No
0
Proposal Timeline Details
Done
Pending
Reject
Engineer
Pending
Approved
Service Name
: Building Permission
Steps No.
Authority / Applicant
Designation
Application Received Date
Application Forward/Approve Date
Duration(In Days)
Expected Completion Days
Delay(In Days)
Project Verified By Technical
Pre Approval Payment
Document Verification
Site Inspection
Post Approval Payment Verification
Post Approval Payment
Architect Digital Signature Status
Certificate Issued
Status / Action
Remark
1
Kartik Maskare
Engineer
26/03/2021
-
1
6
0
NA
NA
NA
NA
NA
NA
Pending
project verification is pending
Close
Top