BUILDING PLAN MANAGEMENT SYSTEM

By Urban Development Department

\ Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:- https://shorturl.at/hGZ37
:
6999
:
MBMC202200003
:
Bhushan Babulal Kardiwal
:
:
11/02/2022
:
MBMC-22-00241
:
Residential
:
800
:
A
:
1/10-एच - 1) भु- भाग मौजे भाईदर गांवातील रेल्वे लाईनच्या पश्चिमेकडील मिळकती र्सव्हे क्रं अविकसित प्र.चौ.मी.
:
Khari
:
4
:
193
:
1
:
1.10
:
800
RESIDENTIAL
Residential
flats
945.61 Sq. mt.
0
6
1
0.00
0.15
945.61 Sq. mt.
0.00 Sq. mt.
0.00 Sq. mt.
 
0.00
0.00
18.60
No
 
No
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor useParking FloorGround FloorStilt FloorEx - Floor Area Floor Used Area Floor Usage Part OC Taken Or Not Typical Floor Part Oc Applied Yes /No Part Oc Applied Area
GROUND FLOOR3.000.153.1521.51ResidentialYesYesYes0.000.00ResidentialNoNoNo0
TYPICAL FLOORS3.003.156.15184.82ResidentialNoNoYes0.000.00ResidentialNoNoNo0
TYPICAL FLOORS3.006.159.15184.82ResidentialNoNoYes0.000.00ResidentialNoNoNo0
TYPICAL FLOORS3.009.1512.15184.82ResidentialNoNoYes0.000.00ResidentialNoNoNo0
TYPICAL FLOORS3.0012.1515.15184.82ResidentialNoNoYes0.000.00ResidentialNoNoNo0
TYPICAL FLOORS3.0015.1518.15184.82ResidentialNoNoYes0.000.00ResidentialNoNoNo0
 
 
Done
Pending
Reject
Structural Engineer
Pending
Approved
Service Name : Building Permission
Steps No. Authority / ApplicantDesignationApplication Received DateApplication Forward/Approve DateDuration(In Days)Expected Completion DaysDelay(In Days)Project Verified By TechnicalPre Approval PaymentDocument VerificationSite InspectionPost Approval Payment VerificationPost Approval PaymentArchitect Digital Signature StatusCertificate IssuedStatus / ActionRemark
1Samira PatilStructural Engineer11/02/202211/02/2022160NANANANANANAForwarded-
2Sachin PatilJunior Engineer-14/02/20221300NANANANANANANANAForwarded
3Keshav ShindeTown Planner-14/02/20221300NANANANANANANANAForwarded
4Hemant ThakurAssistant Director Town Planning-14/02/20221300NANANANANANANANAForwarded
5Dilip DholeMunicipal Commissioner-14/02/20221300NANANANANANANANAApproved
6Samira PatilStructural Engineer14/02/2022-160NANANANANANAPendingEKYC Done
Building Permission Insepction Report Detail
Sr No.AuthorityDesignationSite Visited DateVisit Start TimeVisit End TimeSite Inspection Report
1Sachin PatilJunior Engineer14/02/202204:00 pm05:00 pmView pdf