BUILDING PLAN MANAGEMENT SYSTEM

By Urban Development Department

\ Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:- https://shorturl.at/hGZ37
:
6998
:
MBMC/2022/6998/1872
:
Bhushan Babulal Kardiwal
:
:
11/02/2022
:
MBMC-22-00236
:
Residential
:
200
:
A
:
1/10-एच - 1) भु- भाग मौजे भाईदर गांवातील रेल्वे लाईनच्या पश्चिमेकडील मिळकती र्सव्हे क्रं अविकसित प्र.चौ.मी.
:
MIRA
:
4
:
187
:
1
:
2.00
:
200
RESIDENTIAL
Residential
flats
945.61 Sq. mt.
0
6
1
0.00
0.60
945.61 Sq. mt.
0.00 Sq. mt.
0.00 Sq. mt.
 
0.00
0.00
18.60
Yes
 
No
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor useParking FloorGround FloorStilt FloorEx - Floor Area Floor Used Area Floor Usage Part OC Taken Or Not Typical Floor Part Oc Applied Yes /No Part Oc Applied Area
GROUND FLOOR3.000.603.6021.51ResidentialYesYesYes0.0021.51ResidentialNoNo0
TYPICAL FIRST TO FIFTH3.003.606.60184.82ResidentialNoNoYes0.00184.82ResidentialNoNo0
TYPICAL FIRST TO FIFTH3.006.609.60184.82ResidentialNoNoYes0.000.00ResidentialNoNoNo0
TYPICAL FIRST TO FIFTH3.009.6012.60184.82ResidentialNoNoYes0.000.00ResidentialNoNoNo0
TYPICAL FIRST TO FIFTH3.0012.6015.60184.82ResidentialNoNoYes0.000.00ResidentialNoNoNo0
TYPICAL FIRST TO FIFTH3.0015.6018.60184.82ResidentialNoNoYes0.000.00ResidentialNoNoNo0
 
 
Done
Pending
Reject
Engineer
Pending
Approved
Service Name :  Part Occupancy
Steps No. Authority / ApplicantDesignationApplication Received DateApplication Forward/Approve DateDuration(In Days)Expected Completion DaysDelay(In Days)Project Verified By TechnicalPre Approval PaymentDocument VerificationSite InspectionPost Approval Payment VerificationPost Approval PaymentArchitect Digital Signature StatusCertificate IssuedStatus / ActionRemark
1Samidha PatilEngineer15/02/202215/02/2022160NANANANANANANANAForwarded
2Sachin PatilJunior Engineer-15/02/2022180NANANANANAForwarded
3Keshav ShindeTown Planner-15/02/2022180NANANANANANAForwarded
4Hemant ThakurAssistant Director Town Planning-15/02/2022180NANANANANANAForwarded
5Dilip DholeMunicipal Commissioner-15/02/2022180NANANANANANAApproved
6Vikas ParabJunior Engineer15/02/2022-1NANANANANANANANANAForwardedNA
7Samidha PatilEngineer15/02/202215/02/2022260NANANANANANANADonePayment done by Architect payment verification is pending from first authority
Part Occupancy Insepction Report Detail
Sr No.AuthorityDesignationSite Visited DateVisit Start TimeVisit End TimeSite Inspection Report
1Sachin PatilJunior Engineer15/02/202201:30 pm02:00 pmView pdf