BUILDING PLAN MANAGEMENT SYSTEM

By Urban Development Department

\ Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:- https://shorturl.at/hGZ37
:
6841
:
TMCB202100282
:
Amol Krishnarao Amzire
:
:
29/11/2021
:
TMCB-21-03967
:
Residential
:
100
:
A
:
2A/2) All Survey Number on Both Sides of Ghodbunder Road and Majiwada Village Portion between (Kolshet and Borikade).
:
Thane
:
12
:
321
:
29/11
:
1.10
:
100
A
Residential
flats
406.24 Sq. mt.
0
8
1
0.00
0.45
406.24 Sq. mt.
0.00 Sq. mt.
0.00 Sq. mt.
 
0.00
0.00
24.45
No
 
No
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor useParking FloorGround FloorStilt FloorEx - Floor Area Floor Used Area Floor Usage Part OC Taken Or Not Typical Floor Part Oc Applied Yes /No Part Oc Applied Area
GF3.000.453.4550.78ResidentialNoYesYes0.000.00ResidentialNoNoNo0
FF3.003.456.4550.78ResidentialNoNoYes0.000.00ResidentialNoNoNo0
TYPICAL FLOOR3.006.459.4550.78ResidentialNoNoYes0.000.00ResidentialNoNoNo0
TYPICAL FLOOR3.009.4512.4550.78ResidentialNoNoYes0.000.00ResidentialNoNoNo0
TYPICAL FLOOR3.0012.4515.4550.78ResidentialNoNoYes0.000.00ResidentialNoNoNo0
TYPICAL FLOOR3.0015.4518.4550.78ResidentialNoNoYes0.000.00ResidentialNoNoNo0
TYPICAL FLOOR3.0018.4521.4550.78ResidentialNoNoYes0.000.00ResidentialNoNoNo0
TYPICAL FLOOR3.0021.4524.4550.78ResidentialNoNoYes0.000.00ResidentialNoNoNo0
 
 
Done
Pending
Reject
Architect
Pending
Approved
Service Name : Building Permission
Steps No. Authority / ApplicantDesignationApplication Received DateApplication Forward/Approve DateDuration(In Days)Expected Completion DaysDelay(In Days)Project Verified By TechnicalPre Approval PaymentDocument VerificationSite InspectionPost Approval Payment VerificationPost Approval PaymentArchitect Digital Signature StatusCertificate IssuedStatus / ActionRemark
1test firstArchitect29/11/202129/11/2021160NANANANANANAForwarded-
2Shaligram SonavneSurveyor-29/11/20211300NANANANANANANAForwarded
3Annasaheb SonandkarJunior Engineer29/11/202129/11/2021000NANANANANANANAPending
4Shrinivas RautSurveyor29/11/202129/11/2021000NANANANANANANAPending
5Deepak JagtapDeputy Engineer29/11/202129/11/2021000NANANANANANANAPending
6Vaibhav VaidyaDeputy Engineer--1300NANANANANANANANAPending
Building Permission Insepction Report Detail
Sr No.AuthorityDesignationSite Visited DateVisit Start TimeVisit End TimeSite Inspection Report
1Shaligram SonavneSurveyor29/11/202109:00 am11:00 amView pdf