BUILDING PLAN MANAGEMENT SYSTEM

By Urban Development Department

\ Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:- https://shorturl.at/hGZ37
:
6793
:
NMCB202100127
:
Chandulal Sahebrao Patil
:
:
16/11/2021
:
NMCB-21-03676
:
Residential
:
243
:
A
:
1.10 - रस्ता - दामोदर रस्ता - रहिवास व तत्सम विभागातील मिळकती
:
NMCB/B/2021/APL/00058
:
16/11/2021
:
nashik
:
12
:
2019
:
11
:
1.1
:
243
RESI5
Residential
flats
441.95 Sq. mt.
0
5
1
0.00
0.45
441.95 Sq. mt.
0.00 Sq. mt.
0.00 Sq. mt.
 
0.00
0.00
15.45
Yes
 
No
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor useParking FloorGround FloorStilt FloorEx - Floor Area Floor Used Area Floor Usage Part OC Taken Or Not Typical Floor Part Oc Applied Yes /No Part Oc Applied Area
GF3.000.453.4517.91ResidentialYesYesYes0.000.00ResidentialNoNoNo0
FF SF TF FF 3.003.456.45106.01ResidentialNoNoYes0.000.00ResidentialNoNoNo0
FF SF TF FF 3.006.459.45106.01ResidentialNoNoYes0.000.00ResidentialNoNoNo0
FF SF TF FF 3.009.4512.45106.01ResidentialNoNoYes0.000.00ResidentialNoNoNo0
FF SF TF FF 3.0012.4515.45106.01ResidentialNoNoYes0.000.00ResidentialNoNoNo0
 
 
Done
Pending
Reject
Engineer
Pending
Approved
Service Name : Building Permission
Steps No. Authority / ApplicantDesignationApplication Received DateApplication Forward/Approve DateDuration(In Days)Expected Completion DaysDelay(In Days)Project Verified By TechnicalPre Approval PaymentDocument VerificationSite InspectionPost Approval Payment VerificationPost Approval PaymentArchitect Digital Signature StatusCertificate IssuedStatus / ActionRemark
1chandulal patilEngineer16/11/202116/11/2021160NANANANANANAForwarded-
2Hemant NandurdikarJunior Engineer-16/11/20211300NANANANANANANANAForwarded
3Sachin JadhavDeputy Engineer-16/11/20211300NANANANANANANANAApproved
4chandulal patilEngineer16/11/2021-160NANANANANANAForwarded-
5Sachin JadhavDeputy Engineer-16/11/2021189473018917NANANANANANANAApproved
Building Permission Insepction Report Detail
Sr No.AuthorityDesignationSite Visited DateVisit Start TimeVisit End TimeSite Inspection Report
1Hemant NandurdikarJunior Engineer16/11/202102:00 pm04:00 pmView pdf