BUILDING PLAN MANAGEMENT SYSTEM

By Urban Development Department

\ Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:- https://shorturl.at/hGZ37
:
6613
:
CARPC202100162
:
Priyesh Madhukar Panvalkar
:
:
22/07/2021
:
CARPC-21-02778
:
Residential
:
1000
:
A
:
1/10-
:
mumbai
:
4
:
380
:
20
:
1.100
:
1000
RESI
Residential
flats
131.79 Sq. mt.
0
2
1
0.00
0.45
131.79 Sq. mt.
0.00 Sq. mt.
0.00 Sq. mt.
 
0.00
0.00
7.90
No
 
No
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor useParking FloorGround FloorStilt FloorEx - Floor Area Floor Used Area Floor Usage Part OC Taken Or Not Typical Floor Part Oc Applied Yes /No Part Oc Applied Area
TYP3.500.453.9565.89ResidentialNoNoYes0.000.00ResidentialNoNoNo0
TYP3.503.957.4565.89ResidentialNoNoYes0.000.00ResidentialNoNoNo0
RESI 2
Residential
flats
454.46 Sq. mt.
0
3
1
0.00
0.45
454.46 Sq. mt.
0.00 Sq. mt.
0.00 Sq. mt.
 
0.00
0.00
7.90
No
 
No
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor useParking FloorGround FloorStilt FloorEx - Floor Area Floor Used Area Floor Usage Part OC Taken Or Not Typical Floor Part Oc Applied Yes /No Part Oc Applied Area
TYP3.500.453.95151.49ResidentialNoNoYes0.000.00ResidentialNoNoNo0
TYP3.503.957.45151.49ResidentialNoNoYes0.000.00ResidentialNoNoNo0
TYP3.507.4510.95151.49ResidentialNoNoYes0.000.00ResidentialNoNoNo0
 
 
Done
Pending
Reject
Architect
Pending
Approved
Service Name : Building Permission
Steps No. Authority / ApplicantDesignationApplication Received DateApplication Forward/Approve DateDuration(In Days)Expected Completion DaysDelay(In Days)Project Verified By TechnicalPre Approval PaymentDocument VerificationSite InspectionPost Approval Payment VerificationPost Approval PaymentArchitect Digital Signature StatusCertificate IssuedStatus / ActionRemark
1Rohit MhapankarArchitect22/07/202122/07/2021160NANANANANANAForwarded-
2Sanjay katekarCity Engineer / Sectional Engineer22/07/202122/07/2021000NANANANANANANAForwarded
3Sudhir SalunkheAssistant Town Planner22/07/202122/07/2021000NANANANANANANAForwarded
4Sudhir SalunkheAssistant Town Planner22/07/202122/07/2021000NANANANANANANAForwarded
5Sudhir SalunkheAssistant Town Planner-28/01/20221300NANANANANANAForwarded
6Sanjay katekarCity Engineer / Sectional Engineer-28/01/20221300NANANANANANANAForwarded
7Sudhakar ShindeMunicipal Commissioner-28/01/20221300NANANANANANANANAApproved
8Rohit MhapankarArchitect28/01/2022-160NANANANANANAPending-
Building Permission Insepction Report Detail
Sr No.AuthorityDesignationSite Visited DateVisit Start TimeVisit End TimeSite Inspection Report
1Surveyor PanvelSurveyor22/07/202108:00 am10:00 amView pdf
2Sudhir SalunkheAssistant Town Planner13/08/202103:30 pm05:30 pmView pdf