Toggle navigation
Home
मराठी
User Guide
Presentations
Manuals
FAQs
FAQs - TP-Client(Drawing)
Application(Online)
FAQs - Operational Issue
FAQs - Payment Issue
FAQs - Others Issue
Do's and Don'ts
UDCPR
Circular
Patch
Login
BUILDING PLAN MANAGEMENT SYSTEM
By Urban Development Department
\
Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:-
https://shorturl.at/hGZ37
Proposal Status for Plinth Permission
Proposal No
:
6558
Application No
:
TMCB/2021/6558/1821
Owner Name
:
xys
Additional Owner List
:
View
×
Additional Owner List
Sr No
Name
Address
Mobile No
Email
No result Found
Proposal Date
:
04/06/2018
Proposal Code
:
TMCB-21-ENTRY-03015
Proposal Type
:
Residential
Proposal Plot Area
:
480
TDR Zone
:
Site Area
:
2A/2) All Survey Number on Both Sides of Ghodbunder Road and Majiwada Village Portion between (Kolshet and Borikade).
Site Details
Site Address
:
67/9
Site Location
:
Municipal Corporation B
Survey Number
:
Plot Number
:
67/9,
Premium FSI
:
96.00
Plot Area
:
480
Building and Floor Details
Building Name :
a
Building Category :
Residential
Sub Category :
apartment houses
Total Built Up Area :
480 Sq. mt.
No.of Tenements :
0
No. of Levels :
6
No. of Buildings :
1
Basement Height(m) :
0.15
Plinth Level(m) :
0.15
Residential Built Up Area :
480.00 Sq. mt.
Commercial Built Up Area :
0.00 Sq. mt.
Industrial Built Up Area :
0.00 Sq. mt.
Educational Buildup Area :
0.00
Institutional Buildup Area :
0.00
Building Height :
20.10
Plinth Intimation Taken :
No
Part Occupancy Taken :
No
Floor Details
Floor Name
Floor Height(m)
Bottom Level
Top Level
Floor Area
Floor use
Parking Floor
Ground Floor
Stilt Floor
Ex - Floor Area
Floor Used Area
Floor Usage
Part OC Taken Or Not
Typical Floor
Part Oc Applied Yes /No
Part Oc Applied Area
Proposal Timeline Details
Done
Pending
Reject
Pending
Approved
Service Name
: Plinth Permission
Steps No.
Authority / Applicant
Designation
Application Received Date
Application Forward/Approve Date
Duration(In Days)
Expected Completion Days
Delay(In Days)
Project Verified By Technical
Pre Approval Payment
Document Verification
Site Inspection
Post Approval Payment Verification
Post Approval Payment
Architect Digital Signature Status
Certificate Issued
Status / Action
Remark
1
29/06/2021
-
1
6
0
NA
NA
NA
NA
NA
NA
NA
NA
Approved
Close
Top