BUILDING PLAN MANAGEMENT SYSTEM

By Urban Development Department

\ Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:- https://shorturl.at/hGZ37
:
6457
:
CARPC202100162
:
Priyesh Madhukar Panvalkar
:
:
11/06/2021
:
CARPC-21-02778
:
Residential
:
1000
:
A
:
1/10-
:
mumbai
:
4
:
380
:
20
:
1.100
:
1000
RESI
Residential
flats
131.79 Sq. mt.
0
2
1
0.00
0.45
131.79 Sq. mt.
0.00 Sq. mt.
0.00 Sq. mt.
 
0.00
0.00
7.90
No
 
No
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor useParking FloorGround FloorStilt FloorEx - Floor Area Floor Used Area Floor Usage Part OC Taken Or Not Typical Floor Part Oc Applied Yes /No Part Oc Applied Area
TYP3.500.453.9565.89ResidentialNoNoYes0.000.00ResidentialNoNoNo0
TYP3.503.957.4565.89ResidentialNoNoYes0.000.00ResidentialNoNoNo0
RESI 2
Residential
flats
454.46 Sq. mt.
0
3
1
0.00
0.45
454.46 Sq. mt.
0.00 Sq. mt.
0.00 Sq. mt.
 
0.00
0.00
7.90
No
 
No
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor useParking FloorGround FloorStilt FloorEx - Floor Area Floor Used Area Floor Usage Part OC Taken Or Not Typical Floor Part Oc Applied Yes /No Part Oc Applied Area
TYP3.500.453.95151.49ResidentialNoNoYes0.000.00ResidentialNoNoNo0
TYP3.503.957.45151.49ResidentialNoNoYes0.000.00ResidentialNoNoNo0
TYP3.507.4510.95151.49ResidentialNoNoYes0.000.00ResidentialNoNoNo0
 
 
Done
Pending
Reject
Architect
Pending
Approved
Service Name : Building Permission
Steps No. Authority / ApplicantDesignationApplication Received DateApplication Forward/Approve DateDuration(In Days)Expected Completion DaysDelay(In Days)Project Verified By TechnicalPre Approval PaymentDocument VerificationSite InspectionPost Approval Payment VerificationPost Approval Paymentconcession and relaxationArchitect Digital Signature StatusCertificate IssuedStatus / ActionRemark
1Rohit MhapankarArchitect11/06/202111/06/2021160NANANANANANANAForwarded-
2Sanjay katekarCity Engineer / Sectional Engineer11/06/202111/06/2021000NANANANANANANANAForwarded
3Sudhir SalunkheAssistant Town Planner11/06/202111/06/2021000NANANANANANANANAPending
4Sudhir SalunkheAssistant Town Planner11/06/202111/06/2021000NANANANANANANANAPending
Building Permission Insepction Report Detail
Sr No.AuthorityDesignationSite Visited DateVisit Start TimeVisit End TimeSite Inspection Report
1Sudhir SalunkheAssistant Town Planner11/06/202110:00 pm10:00 pmView pdf
2Surveyor PanvelSurveyor07/08/202110:00 am12:00 pm