Toggle navigation
Home
मराठी
User Guide
Presentations
Manuals
FAQs
FAQs - TP-Client(Drawing)
Application(Online)
FAQs - Operational Issue
FAQs - Payment Issue
FAQs - Others Issue
Do's and Don'ts
UDCPR
Circular
Patch
Login
BUILDING PLAN MANAGEMENT SYSTEM
By Urban Development Department
\
Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:-
https://shorturl.at/hGZ37
Proposal Status for Plinth Permission
Proposal No
:
6421
Application No
:
CBRRC/2021/6421/1810
Owner Name
:
priyeash
Additional Owner List
:
View
×
Additional Owner List
Sr No
Name
Address
Mobile No
Email
No result Found
Proposal Date
:
08/06/2021
Proposal Code
:
CBRRC-21-ENTRY-02700
Proposal Type
:
Residential
Proposal Plot Area
:
TDR Zone
:
Site Area
:
1/11-4) वारà¥à¤¡ कà¥à¤°. 6/27 माळनोका ते आकाशवाणी या रसà¥à¤¤à¥à¤¯à¤¾à¤šà¥à¤¯à¤¾ पशà¥à¤šà¤¿à¤®à¥‡à¤•à¤¡à¥€à¤² या वॉरà¥à¤¡à¤¾à¤¤à¥€à¤² सरà¥à¤µ à¤à¥‚à¤à¤¾à¤— (मौजे à¤à¤¾à¤¡à¤—ांव वॉरà¥à¤¡ 6)
Site Details
Site Address
:
Site Location
:
Municipal Council B
Survey Number
:
Plot Number
:
Premium FSI
:
5454
Plot Area
:
Building and Floor Details
Building Name :
Tower
Building Category :
Residential
Sub Category :
residential hotels
Total Built Up Area :
12 Sq. mt.
No.of Tenements :
12
No. of Levels :
2
No. of Buildings :
1
Basement Height(m) :
0.50
Plinth Level(m) :
0.50
Residential Built Up Area :
4.00 Sq. mt.
Commercial Built Up Area :
4.00 Sq. mt.
Industrial Built Up Area :
4.00 Sq. mt.
Educational Buildup Area :
0.00
Institutional Buildup Area :
0.00
Building Height :
0.00
Plinth Intimation Taken :
Yes
Part Occupancy Taken :
No
Floor Details
Floor Name
Floor Height(m)
Bottom Level
Top Level
Floor Area
Floor use
Parking Floor
Ground Floor
Stilt Floor
Ex - Floor Area
Floor Used Area
Floor Usage
Part OC Taken Or Not
Typical Floor
Part Oc Applied Yes /No
Part Oc Applied Area
Proposal Timeline Details
Done
Pending
Reject
Pending
Approved
Service Name
: Plinth Permission
Steps No.
Authority / Applicant
Designation
Application Received Date
Application Forward/Approve Date
Duration(In Days)
Expected Completion Days
Delay(In Days)
Project Verified By Technical
Pre Approval Payment
Document Verification
Site Inspection
Post Approval Payment Verification
Post Approval Payment
Architect Digital Signature Status
Certificate Issued
Status / Action
Remark
1
17/06/2021
-
1
6
0
NA
NA
NA
NA
NA
NA
NA
NA
Approved
Close
Top