BUILDING PLAN MANAGEMENT SYSTEM

By Urban Development Department

\ Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:- https://shorturl.at/hGZ37
:
5374
:
CARPC202000181
:
Name
:
:
05/08/2020
:
CHGQ-CARPC-20-0002
:
Residential
:
1111
:
A
:
1/10-
:
CARPC/B/2020/APL/00452
:
06/08/2020
:
Proposed Site Address
:
COUNCIL A
:
385
:
165
:
1
:
1111
RESIDENTIAL
Residential
Single Dwelling
525.5 Sq. mt.
1
2
1
0.00
0.50
521.50 Sq. mt.
0.00 Sq. mt.
4.00 Sq. mt.
 
0.00
0.00
3.15
Yes
 
Yes
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor useParking FloorGround FloorStilt FloorEx - Floor Area Floor Used Area Floor Usage Part OC Taken Or Not Typical Floor Part Oc Applied Yes /No Part Oc Applied Area
GR3.000.000.00260.75NYesYesYes0.000.00NNoNoNo0
FF3.000.000.00260.75NYesYesYes0.000.00NNoNoNo0
RESIDENTIAL 2
Residential
Single Dwelling
1175.6 Sq. mt.
1
2
1
0.00
0.15
1171.60 Sq. mt.
0.00 Sq. mt.
4.00 Sq. mt.
 
0.00
0.00
3.15
Yes
 
Yes
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor useParking FloorGround FloorStilt FloorEx - Floor Area Floor Used Area Floor Usage Part OC Taken Or Not Typical Floor Part Oc Applied Yes /No Part Oc Applied Area
GR3.000.000.00585.80NYesYesYes0.000.00NNoNoNo0
FF3.000.000.00585.80NYesYesYes0.000.00NNoNoNo0
RESIDENTIAL 3
Residential
Single Dwelling
456.48 Sq. mt.
1
1
1
0.00
0.15
452.48 Sq. mt.
0.00 Sq. mt.
4.00 Sq. mt.
 
0.00
0.00
3.15
Yes
 
Yes
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor useParking FloorGround FloorStilt FloorEx - Floor Area Floor Used Area Floor Usage Part OC Taken Or Not Typical Floor Part Oc Applied Yes /No Part Oc Applied Area
GR3.000.000.00452.48NYesYesYes0.000.00NNoNoNo0
 
 
Done
Pending
Reject
Engineer
Pending
Approved
Service Name : Building Permission
Steps No. Authority / ApplicantDesignationApplication Received DateApplication Forward/Approve DateDuration(In Days)Expected Completion DaysDelay(In Days)Project Verified By TechnicalPre Approval PaymentDocument VerificationSite InspectionPost Approval Payment VerificationPost Approval PaymentArchitect Digital Signature StatusCertificate IssuedStatus / ActionRemark
1Kartik Maskare Engineer05/08/202006/08/2020160NANANANANANAForwarded-
2Sanjay katekarCity Engineer / Sectional Engineer05/08/202006/08/2020000NANANANANANANAForwarded
3Sudhir SalunkheAssistant Town Planner05/08/202006/08/2020000NANANANANANANAForwarded
4Sudhir SalunkheAssistant Town Planner05/08/202006/08/2020000NANANANANANANAForwarded
5Sudhir SalunkheAssistant Town Planner-06/08/20201300NANANANANANAForwarded
6Sudhakar ShindeChief Officer-06/08/20201300NANANANANANANANAApproved
7Kartik Maskare Engineer06/08/2020-160NANANANANANAPending-
Building Permission Insepction Report Detail
Sr No.AuthorityDesignationSite Visited DateVisit Start TimeVisit End TimeSite Inspection Report
1Sudhir SalunkheAssistant Town Planner05/08/202011:00 am01:00 pmView pdf