BUILDING PLAN MANAGEMENT SYSTEM

By Urban Development Department

\ Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:- https://shorturl.at/hGZ37
:
5370
:
RCARPC202000320
:
Name
:
:
31/07/2020
:
CHGQ-CARPC-20-0008
:
Residential
:
500
:
A
:
1/6-उर्वरित गावठाणातील सर्व मिळक ती.
:
CARPC/RB/2020/APL/00030
:
21/10/2020
:
:
Proposed Site Address
:
COUNCIL A
:
441
:
1651
:
1
:
500
Existing Building Permission Details
RESIDENTIAL
Residential
MultiFamily
111.22 Sq. mt.
0
1
1
0.00
0.00
107.22 Sq. mt.
0.00 Sq. mt.
4.00 Sq. mt.
0.00
0.00
3.00
No
 
No
 
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor UseParking FloorGround FloorStilt FloorFloor Height(Below Ground Level(Meter))Basement FloorRe-Creation FloorService FloorPodium FloorTerrace FloorStep MarginSpecify Floors With Identical Plan And BUA Polyline
GROUND FLOOR3.000.000.00107.22ResidentialNoYesYes0.000.00ResidentialNoNoNo0.000
Revised Building Permission Details
RESIDENTIAL
Residential
Single Dwelling
88 Sq. mt.
1
2
1
0.00
0.90
84.00 Sq. mt.
0.00 Sq. mt.
4.00 Sq. mt.
0.00
0.00
6.90
No
 
No
 
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor UseParking FloorGround FloorStilt FloorFloor Height(Below Ground Level(Meter))Basement FloorRe-Creation FloorService FloorPodium FloorTerrace FloorStep MarginSpecify Floors With Identical Plan And BUA Polyline
GR3.000.000.0042.00ResidentialNoNoYes0.000.00ResidentialNoNoNo0.000
FF3.000.000.0042.00ResidentialNoNoYes0.000.00ResidentialNoNoNo0.000
 
 
Done
Pending
Reject
Engineer
Pending
Approved
Service Name : Revised Building Permission
Steps No. Authority / ApplicantDesignationApplication Received DateApplication Forward/Approve DateDuration(In Days)Expected Completion DaysDelay(In Days)Project Verified By TechnicalPre Approval PaymentDocument VerificationSite InspectionPost Approval Payment VerificationPost Approval PaymentArchitect Digital Signature StatusCertificate IssuedStatus / ActionRemark
1Kartik Maskare Engineer31/07/2020-160NANANANANANANAForwarded-
2Sanjay katekarCity Engineer / Sectional Engineer31/07/2020-000NANANANANANANAForwarded
3Sudhir SalunkheAssistant Town Planner31/07/2020-000NANANANANANANAForwarded
4Sudhir SalunkheAssistant Town Planner31/07/2020-000NANANANANANANAForwarded
5Sudhir SalunkheAssistant Town Planner-21/10/20201300NANANANANANAForwarded
6Sanjay katekarCity Engineer / Sectional Engineer-21/10/20201300NANANANANANANAForwarded
7Sudhakar ShindeChief Officer-21/10/20201300NANANANANANANANAApproved
8Kartik Maskare Engineer07/08/2020-160NANANANANANAPending-
Revised Building Permission Insepction Report Detail
Sr No.AuthorityDesignationSite Visited DateVisit Start TimeVisit End TimeSite Inspection Report
1Sudhir SalunkheAssistant Town Planner07/08/202007:30 pm09:30 pmView pdf