BUILDING PLAN MANAGEMENT SYSTEM

By Urban Development Department

\ Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:- https://shorturl.at/hGZ37
:
5355
:
RCARPC202000303
:
Priyesh Madhukar Panvalkar
:
:
24/07/2020
:
CHGQ-CARPC-20-0004
:
Residential
:
111
:
A
:
1/10-
:
:
Proposed Site Address
:
COUNCIL A
:
375
:
1165
:
1.00
:
111
Existing Building Permission Details
RESIDENTIAL
Residential
Single Dwelling
196.5 Sq. mt.
1
1
1
0.00
0.50
192.50 Sq. mt.
0.00 Sq. mt.
4.00 Sq. mt.
0.00
0.00
3.50
No
 
No
 
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor UseParking FloorGround FloorStilt FloorFloor Height(Below Ground Level(Meter))Basement FloorRe-Creation FloorService FloorPodium FloorTerrace FloorStep MarginSpecify Floors With Identical Plan And BUA Polyline
GROUND FLOOR3.000.000.00192.50ResidentialNoYesYes0.000.00ResidentialNoNoNo0.000
Revised Building Permission Details
RESIDENTIAL
Residential
Single Dwelling
172.66 Sq. mt.
3
3
1
0.00
0.90
168.66 Sq. mt.
0.00 Sq. mt.
4.00 Sq. mt.
0.00
0.00
9.90
No
 
No
 
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor UseParking FloorGround FloorStilt FloorFloor Height(Below Ground Level(Meter))Basement FloorRe-Creation FloorService FloorPodium FloorTerrace FloorStep MarginSpecify Floors With Identical Plan And BUA Polyline
GR3.000.000.0046.66YYesNoYes0.000.00YNoNoNo0.000
FF SF TF3.000.000.00122.00NYesNoYes0.000.00NNoNoNo0.000
 
 
Done
Pending
Reject
Engineer
Pending
Approved
Service Name : Revised Building Permission
Steps No. Authority / ApplicantDesignationApplication Received DateApplication Forward/Approve DateDuration(In Days)Expected Completion DaysDelay(In Days)Project Verified By TechnicalPre Approval PaymentDocument VerificationSite InspectionPost Approval Payment VerificationPost Approval PaymentArchitect Digital Signature StatusCertificate IssuedStatus / ActionRemark
1Kartik Maskare Engineer24/07/202024/07/2020160NANANANANANAForwarded-
2Sanjay katekarCity Engineer / Sectional Engineer24/07/202024/07/2020000NANANANANANANAForwarded
3Sudhir SalunkheAssistant Town Planner24/07/202024/07/2020000NANANANANANANAForwarded
4Sudhir SalunkheAssistant Town Planner24/07/202024/07/2020000NANANANANANANAPending
5Sudhir SalunkheAssistant Town Planner--1300NANANANANANAProposal Reassign & Document Reassign
6Kartik Maskare Engineer--160NANANANANANAForwardedNA
7Sudhir SalunkheAssistant Town Planner-24/07/2020130NANANANANANANAForwarded
8Kartik Maskare Engineer24/07/2020-160NANANANANAProposal Resubmit PendingNA
Revised Building Permission Insepction Report Detail
Sr No.AuthorityDesignationSite Visited DateVisit Start TimeVisit End TimeSite Inspection Report
1Sudhir SalunkheAssistant Town Planner24/07/202011:30 am01:30 pmView pdf