BUILDING PLAN MANAGEMENT SYSTEM

By Urban Development Department

\ Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:- https://shorturl.at/hGZ37
:
5269
:
RCARPC202000190
:
Priyesh Madhukar Panvalkar
:
:
03/05/2020
:
CHGQ-CARPC-20-0004
:
Residential
:
111
:
A
:
1/10-
:
CARPC/RB/2020/APL/00022
:
03/05/2020
:
:
Proposed Site Address
:
COUNCIL A
:
375
:
544
:
1.00
:
111
Existing Building Permission Details
RESIDENTIAL
Residential
Single Dwelling
98.74 Sq. mt.
0
1
1
0.00
0.90
94.74 Sq. mt.
0.00 Sq. mt.
4.00 Sq. mt.
0.00
0.00
3.90
No
 
No
 
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor UseParking FloorGround FloorStilt FloorFloor Height(Below Ground Level(Meter))Basement FloorRe-Creation FloorService FloorPodium FloorTerrace FloorStep MarginSpecify Floors With Identical Plan And BUA Polyline
GROUND FLOOR3.000.000.0094.74NYesNoYes0.000.00NNoNoNo0.000
Revised Building Permission Details
RESIDENTIAL
Residential
Single Dwelling
172.66 Sq. mt.
3
3
1
0.00
0.90
168.66 Sq. mt.
0.00 Sq. mt.
4.00 Sq. mt.
0.00
0.00
9.90
No
 
No
 
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor UseParking FloorGround FloorStilt FloorFloor Height(Below Ground Level(Meter))Basement FloorRe-Creation FloorService FloorPodium FloorTerrace FloorStep MarginSpecify Floors With Identical Plan And BUA Polyline
GR3.000.000.0046.66YYesNoYes0.000.00YNoNoNo0.000
FF SF TF3.000.000.00122.00NYesNoYes0.000.00NNoNoNo0.000
 
 
Done
Pending
Reject
Engineer
Pending
Approved
Service Name : Revised Building Permission
Steps No. Authority / ApplicantDesignationApplication Received DateApplication Forward/Approve DateDuration(In Days)Expected Completion DaysDelay(In Days)Project Verified By TechnicalPre Approval PaymentDocument VerificationSite InspectionPost Approval Payment VerificationPost Approval PaymentArchitect Digital Signature StatusCertificate IssuedStatus / ActionRemark
1Kartik Maskare Engineer03/05/202002/05/2020160NANANANANANAForwarded-
2Sanjay katekarCity Engineer / Sectional Engineer03/05/202002/05/2020000NANANANANANANAForwarded
3Sudhir SalunkheAssistant Town Planner03/05/202002/05/2020000NANANANANANANAForwarded
4Sudhir SalunkheAssistant Town Planner03/05/202002/05/2020000NANANANANANANAForwarded
5Sudhir SalunkheAssistant Town Planner-03/05/20201300NANANANANANAForwarded
6Sanjay katekarCity Engineer / Sectional Engineer-03/05/20201300NANANANANANANAForwarded
7Sudhir SalunkheAssistant Town Planner-03/05/20201300NANANANANANAForwarded
8Sudhakar ShindeChief Officer-03/05/20201300NANANANANANANANAApproved
9Kartik Maskare Engineer03/05/2020-160NANANANANANAPending-
Revised Building Permission Insepction Report Detail
Sr No.AuthorityDesignationSite Visited DateVisit Start TimeVisit End TimeSite Inspection Report
1Sudhir SalunkheAssistant Town Planner03/05/202011:00 am01:00 pmView pdf