BUILDING PLAN MANAGEMENT SYSTEM

By Urban Development Department

\ Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:- https://shorturl.at/hGZ37
:
5226
:
RCARPC202000058
:
Name
:
:
27/03/2020
:
CHGQ-CARPC-20-0001
:
Residential
:
100
:
A
:
1/10-
:
:
Proposed Site Address
:
COUNCIL A
:
385
:
854
:
1
:
100
Existing Building Permission Details
BUNGLOW
Mixed
mixed
65.41 Sq. mt.
24
1
1
0.00
0.45
65.41 Sq. mt.
0.00 Sq. mt.
0.00 Sq. mt.
0.00
0.00
3.45
No
 
No
 
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor UseParking FloorGround FloorStilt FloorFloor Height(Below Ground Level(Meter))Basement FloorRe-Creation FloorService FloorPodium FloorTerrace FloorStep MarginSpecify Floors With Identical Plan And BUA Polyline
GROUND FLOOR3.000.000.000.00CommercialYesNoNo0.00CommercialNoNoNo0
Revised Building Permission Details
RESIDENTIAL
Residential
Single Dwelling
162.9 Sq. mt.
1
2
1
0.00
0.60
162.90 Sq. mt.
0.00 Sq. mt.
0.00 Sq. mt.
0.00
0.00
6.60
No
 
No
 
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor UseParking FloorGround FloorStilt FloorFloor Height(Below Ground Level(Meter))Basement FloorRe-Creation FloorService FloorPodium FloorTerrace FloorStep MarginSpecify Floors With Identical Plan And BUA Polyline
GROUND FLOOR3.000.000.0081.45ResidentialNoNoNo0.00ResidentialNoNoNo0
FIRST FLOOR3.000.000.0081.45ResidentialNoNoNo0.00ResidentialNoNoNo0
 
 
Done
Pending
Reject
Engineer
Pending
Approved
Service Name : Revised Building Permission
Steps No. Authority / ApplicantDesignationApplication Received DateApplication Forward/Approve DateDuration(In Days)Expected Completion DaysDelay(In Days)Project Verified By TechnicalPre Approval PaymentDocument VerificationSite InspectionPost Approval Payment VerificationPost Approval PaymentArchitect Digital Signature StatusCertificate IssuedStatus / ActionRemark
1Kartik Maskare Engineer27/03/202027/03/2020160NANANANANANAForwarded-
2Sanjay katekarCity Engineer / Sectional Engineer27/03/202027/03/2020000NANANANANANANAForwarded
3Sudhir SalunkheAssistant Town Planner27/03/202027/03/2020000NANANANANANANAForwarded
4Sudhir SalunkheAssistant Town Planner27/03/202027/03/2020000NANANANANANANAPending
5Sudhir SalunkheAssistant Town Planner-27/03/20201300NANANANANANAPending
6Kartik Maskare Engineer27/03/2020-160NANANANANAForwardedNA
7Sudhir SalunkheAssistant Town Planner27/03/202027/03/20201300NANANANANANAPending
Revised Building Permission Insepction Report Detail
Sr No.AuthorityDesignationSite Visited DateVisit Start TimeVisit End TimeSite Inspection Report
1Sudhir SalunkheAssistant Town Planner27/03/202011:00 am01:00 pmView pdf