BUILDING PLAN MANAGEMENT SYSTEM

By Urban Development Department

\ Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:- https://shorturl.at/hGZ37
:
5223
:
RCARPC202000131
:
Name
:
:
24/03/2020
:
CHGQ-CARPC-20-0001
:
Residential
:
111
:
A
:
2.30 - ना.विकास विभाग उर्वरीत मिळकती प्र.चौ.म
:
CARPC/RB/2020/APL/00018
:
24/03/2020
:
:
Proposed Site Address
:
COUNCIL A
:
289
:
545
:
1
:
111
Existing Low Risk Based Building Permission (From 1 - 150 sq. meter ) Details
RESIDENTIAL
Residential
Single Dwelling
55.99 Sq. mt.
1
1
1
0.00
0.15
51.99 Sq. mt.
0.00 Sq. mt.
4.00 Sq. mt.
0.00
0.00
3.15
No
 
No
 
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor UseParking FloorGround FloorStilt FloorFloor Height(Below Ground Level(Meter))Basement FloorRe-Creation FloorService FloorPodium FloorTerrace FloorStep MarginSpecify Floors With Identical Plan And BUA Polyline
GROUND FLOOR3.000.000.0051.99ResidentialNoNoNo0.00ResidentialNoNoNo0
Revised Low Risk Based Building Permission (From 1 - 150 sq. meter ) Details
RESIDENTIAL
Residential
Single Dwelling
55.99 Sq. mt.
1
1
1
0.00
0.15
51.99 Sq. mt.
0.00 Sq. mt.
4.00 Sq. mt.
0.00
0.00
3.15
No
 
No
 
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor UseParking FloorGround FloorStilt FloorFloor Height(Below Ground Level(Meter))Basement FloorRe-Creation FloorService FloorPodium FloorTerrace FloorStep MarginSpecify Floors With Identical Plan And BUA Polyline
GROUND FLOOR3.000.000.0051.99ResidentialNoNoNo0.00ResidentialNoNoNo0
 
 
Done
Pending
Reject
Engineer
Pending
Approved
Service Name : Revised Building Permission (Low Risk)
Steps No. Authority / ApplicantDesignationApplication Received DateApplication Forward/Approve DateDuration(In Days)Expected Completion DaysDelay(In Days)Project Verified By TechnicalPre Approval PaymentDocument VerificationSite InspectionPost Approval Payment VerificationPost Approval PaymentArchitect Digital Signature StatusCertificate IssuedStatus / ActionRemark
1Kartik Maskare Engineer24/03/2020-160NANANANANANANAForwarded-
2Sudhir SalunkheAssistant Town Planner-24/03/20201300NANANANANANAForwarded
3Kartik Maskare Engineer24/03/2020-160NANANANANANAPending-
Revised Building Permission Insepction Report Detail
Sr No.AuthorityDesignationSite Visited DateVisit Start TimeVisit End TimeSite Inspection Report
1Sudhir SalunkheAssistant Town Planner09/04/202002:30 pm04:30 pmView pdf