BUILDING PLAN MANAGEMENT SYSTEM

By Urban Development Department

\ Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:- https://shorturl.at/hGZ37
:
5184
:
RCARPC202000019
:
Name
:
:
10/02/2020
:
CHGQ-CARPC-19-000285
:
Mixed
:
500
:
A
:
1/10-
:
CARPC/RB/2020/APL/00023
:
07/05/2020
:
:
Proposed Site Address
:
COUNCIL A
:
385
:
India
:
1.30
:
500
Revised Building Permission Details
MIXED
Mixed
mixed
1011.05 Sq. mt.
10
5
1
0.00
0.45
805.64 Sq. mt.
201.41 Sq. mt.
4.00 Sq. mt.
0.00
0.00
14.95
Yes
 
Yes
 
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor UseParking FloorGround FloorStilt FloorFloor Height(Below Ground Level(Meter))Basement FloorRe-Creation FloorService FloorPodium FloorTerrace FloorStep MarginSpecify Floors With Identical Plan And BUA Polyline
GROUND FLOOR2.900.000.00201.41CommercialNoNoNo0.00CommercialNoNoNo0
FIRST SECOND THIRD FOURTH FLOOR2.900.000.00805.64ResidentialNoNoNo0.00ResidentialNoNoNo0
Revised Building Permission Details
MIXED
Mixed
mixed
1011.05 Sq. mt.
10
5
1
0.00
0.45
805.64 Sq. mt.
201.41 Sq. mt.
4.00 Sq. mt.
0.00
0.00
14.95
No
 
No
 
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor UseParking FloorGround FloorStilt FloorFloor Height(Below Ground Level(Meter))Basement FloorRe-Creation FloorService FloorPodium FloorTerrace FloorStep MarginSpecify Floors With Identical Plan And BUA Polyline
GROUND FLOOR2.900.000.00201.41CommercialNoNoNo0.00CommercialNoNoNo0
FIRST SECOND THIRD FOURTH FLOOR2.900.000.00805.64ResidentialNoNoNo0.00ResidentialNoNoNo0
 
 
Done
Pending
Reject
Engineer
Pending
Approved
Service Name : Revised Building Permission
Steps No. Authority / ApplicantDesignationApplication Received DateApplication Forward/Approve DateDuration(In Days)Expected Completion DaysDelay(In Days)Project Verified By TechnicalPre Approval PaymentDocument VerificationSite InspectionPost Approval Payment VerificationPost Approval PaymentArchitect Digital Signature StatusCertificate IssuedStatus / ActionRemark
1Kartik Maskare Engineer10/02/202006/05/202087681NANANANANANAForwarded-
2Sanjay katekarCity Engineer / Sectional Engineer10/02/202006/05/2020000NANANANANANANAForwarded
3Sudhir SalunkheAssistant Town Planner10/02/202006/05/2020000NANANANANANANAForwarded
4Sudhir SalunkheAssistant Town Planner10/02/202006/05/2020000NANANANANANANAForwarded
5Sudhir SalunkheAssistant Town Planner-07/05/20201300NANANANANANAForwarded
6Sanjay katekarCity Engineer / Sectional Engineer-07/05/20201300NANANANANANANAForwarded
7Sudhakar ShindeChief Officer-07/05/20201300NANANANANANANANAApproved
8Kartik Maskare Engineer07/05/2020-160NANANANANANAPending-
Revised Building Permission Insepction Report Detail
Sr No.AuthorityDesignationSite Visited DateVisit Start TimeVisit End TimeSite Inspection Report
1Sudhir SalunkheAssistant Town Planner06/05/202002:30 pm04:30 pmView pdf