BUILDING PLAN MANAGEMENT SYSTEM

By Urban Development Department

\ Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:- https://shorturl.at/hGZ37
:
5180
:
CARPC/2020/5180/1530
:
Name
:
:
05/02/2020
:
CHGQ-CARPC-19-0002
:
Mixed
:
500
:
A
:
1/10-
:
Proposed Site Address
:
COUNCIL A
:
385
:
565
:
1.30
:
500
Existing Building Permission Details
MIXED
Mixed
mixed
1011.05 Sq. mt.
9
5
1
0.00
0.45
805.64 Sq. mt.
201.41 Sq. mt.
4.00 Sq. mt.
0.00
0.00
14.95
Yes
 
No
 
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor UseParking FloorGround FloorStilt FloorFloor Height(Below Ground Level(Meter))Basement FloorRe-Creation FloorService FloorPodium FloorTerrace FloorStep MarginSpecify Floors With Identical Plan And BUA Polyline
FIRST SECOND THIRD FOURTH FLOOR2.900.000.00805.64ResidentialNoNoNo0.00ResidentialNoNoNo0
GROUND FLOOR2.900.000.00201.41CommercialNoNoNo0.00CommercialNoNoNo0
Revised Building Permission Details
MIXED
Mixed
mixed
1011.05 Sq. mt.
10
5
1
0.00
0.45
805.64 Sq. mt.
201.41 Sq. mt.
4.00 Sq. mt.
0.00
0.00
14.95
Yes
 
No
 
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor UseParking FloorGround FloorStilt FloorFloor Height(Below Ground Level(Meter))Basement FloorRe-Creation FloorService FloorPodium FloorTerrace FloorStep MarginSpecify Floors With Identical Plan And BUA Polyline
GROUND FLOOR2.900.000.00201.41CommercialNoNoNo0.00CommercialNoNoNo0
FIRST SECOND THIRD FOURTH FLOOR2.900.000.00805.64ResidentialNoNoNo0.00ResidentialNoNoNo0
 
 
Done
Pending
Reject
Engineer
Pending
Approved
Service Name :  Full Occupancy
Steps No. Authority / ApplicantDesignationApplication Received DateApplication Forward/Approve DateDuration(In Days)Expected Completion DaysDelay(In Days)Project Verified By TechnicalPre Approval PaymentDocument VerificationSite InspectionPost Approval Payment VerificationPost Approval PaymentArchitect Digital Signature StatusCertificate IssuedStatus / ActionRemark
1Kartik Maskare Engineer20/12/202020/12/2020160NANANANANANANAForwardedPayment Done by Architect
2Sudhir SalunkheAssistant Town Planner-31/12/20201300NANANANANAForwarded
3Sanjay katekarCity Engineer / Sectional Engineer--1300NANANANANANAReassign
4Kartik Maskare Engineer--160NANANANANANANADocument Resubmit PendingDocument Resubmit Pending
Full Occupancy Insepction Report Detail
Sr No.AuthorityDesignationSite Visited DateVisit Start TimeVisit End TimeSite Inspection Report
1Sudhir SalunkheAssistant Town Planner31/12/202004:30 pm06:30 pm