BUILDING PLAN MANAGEMENT SYSTEM

By Urban Development Department

\ Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:- https://shorturl.at/hGZ37
:
5738
:
TMCB202100084
:
Amit Sharad Jadhav;Vinod Khanzode
:
:
01/03/2021
:
TMCB-21-00413
:
Mixed
:
2905
:
A
:
2A/2) All Survey Number on Both Sides of Ghodbunder Road and Majiwada Village Portion between (Kolshet and Borikade).
:
TMCB/B/2021/APL/00032
:
01/03/2021
:
$
:
12
:
1131694
:
26
:
0.75
:
2905
SUNRISE BUILDING
Mixed
Mixed
4582.62 Sq. mt.
0
6
1
0.00
0.15
4060.04 Sq. mt.
522.58 Sq. mt.
0.00 Sq. mt.
 
0.00
0.00
17.85
Yes
 
No
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor useParking FloorGround FloorStilt FloorEx - Floor Area Floor Used Area Floor Usage Part OC Taken Or Not Typical Floor Part Oc Applied Yes /No Part Oc Applied Area
PARKING FLOOR2.950.153.100.00MixedYesYesYes0.000.00MixedNoNoNo0
FIRST FLOOR2.953.106.05854.01MixedNoNoYes0.000.00MixedNoNoNo0
SECOND FLOOR2.956.059.00927.28MixedNoNoYes0.000.00MixedNoNoNo0
THIRD FLOOR2.959.0011.95910.55MixedNoNoYes0.000.00MixedNoNoNo0
FOURTH FLOOR2.9511.9514.90927.28ResidentialNoNoYes0.000.00ResidentialNoNoNo0
FIFTH FLOOR2.9514.9017.85440.92ResidentialNoNoYes0.000.00ResidentialNoNoNo0
 
 
Done
Pending
Reject
Architect
Pending
Approved
Service Name : Building Permission
Steps No. Authority / ApplicantDesignationApplication Received DateApplication Forward/Approve DateDuration(In Days)Expected Completion DaysDelay(In Days)Project Verified By TechnicalPre Approval PaymentDocument VerificationSite InspectionPost Approval Payment VerificationPost Approval PaymentArchitect Digital Signature StatusCertificate IssuedStatus / ActionRemark
1Akshay BhartiArchitect01/03/202101/03/2021160NANANANANANAForwarded-
2Annasaheb SonandkarJunior Engineer01/03/202101/03/2021000NANANANANANANAForwarded
3Shrinivas RautSurveyor01/03/202101/03/2021000NANANANANANANAForwarded
4Deepak JagtapDeputy Engineer01/03/202101/03/2021000NANANANANANANAForwarded
5Junior EngineerJunior Engineer-01/03/20211300NANANANANANANANAForwarded
6Municipal CommissionerMunicipal Commissioner-01/03/20211300NANANANANANANANAApproved
7Akshay BhartiArchitect01/03/2021-160NANANANANANAPendingEKYC Done
Building Permission Insepction Report Detail
Sr No.AuthorityDesignationSite Visited DateVisit Start TimeVisit End TimeSite Inspection Report
1Junior EngineerJunior Engineer01/03/202107:30 pm09:30 pmView pdf