Toggle navigation
Home
मराठी
User Guide
Presentations
Manuals
FAQs
FAQs - TP-Client(Drawing)
Application(Online)
FAQs - Operational Issue
FAQs - Payment Issue
FAQs - Others Issue
Do's and Don'ts
UDCPR
Circular
Patch
Login
BUILDING PLAN MANAGEMENT SYSTEM
By Urban Development Department
\
Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:-
https://shorturl.at/hGZ37
Proposal Status for Plinth Permission
Proposal No
:
5636
Application No
:
CARPC/2021/5636/1624
Owner Name
:
Sanjay Salokhe
Additional Owner List
:
View
×
Additional Owner List
Sr No
Name
Address
Mobile No
Email
No result Found
Proposal Date
:
01/09/2020
Proposal Code
:
CHGQ-CARPC-ENTRY-5636
Proposal Type
:
Residential
Proposal Plot Area
:
56516
TDR Zone
:
Site Area
:
1/10-
Site Details
Site Address
:
Panvel
Site Location
:
COUNCIL A
Survey Number
:
156151
Plot Number
:
561
Premium FSI
:
1
Plot Area
:
56516
Building and Floor Details
Building Name :
Residential
Building Category :
Residential
Sub Category :
Total Built Up Area :
5000 Sq. mt.
No.of Tenements :
0
No. of Levels :
2
No. of Buildings :
1
Basement Height(m) :
0.00
Plinth Level(m) :
0.00
Residential Built Up Area :
5000.00 Sq. mt.
Commercial Built Up Area :
0.00 Sq. mt.
Industrial Built Up Area :
0.00 Sq. mt.
Educational Buildup Area :
0.00
Institutional Buildup Area :
0.00
Building Height :
0.00
Plinth Intimation Taken :
Yes
Part Occupancy Taken :
No
Floor Details
Floor Name
Floor Height(m)
Bottom Level
Top Level
Floor Area
Floor use
Parking Floor
Ground Floor
Stilt Floor
Ex - Floor Area
Floor Used Area
Floor Usage
Part OC Taken Or Not
Typical Floor
Part Oc Applied Yes /No
Part Oc Applied Area
Proposal Timeline Details
Done
Pending
Reject
Pending
Approved
Service Name
: Plinth Permission
Steps No.
Authority / Applicant
Designation
Application Received Date
Application Forward/Approve Date
Duration(In Days)
Expected Completion Days
Delay(In Days)
Project Verified By Technical
Pre Approval Payment
Document Verification
Site Inspection
Post Approval Payment Verification
Post Approval Payment
Architect Digital Signature Status
Certificate Issued
Status / Action
Remark
1
04/02/2021
-
1
6
0
NA
NA
NA
NA
NA
NA
NA
NA
Approved
Plinth Permission Insepction Report Detail
Sr No.
Authority
Designation
Site Visited Date
Visit Start Time
Visit End Time
Site Inspection Report
1
Sudhir Salunkhe
Assistant Town Planner
04/02/2021
10:30 am
12:30 pm
View pdf
Close
Top