BUILDING PLAN MANAGEMENT SYSTEM

By Urban Development Department

\ Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:- https://shorturl.at/hGZ37
:
5489
:
RCARPC202000441
:
Name
:
:
29/10/2020
:
CHGQ-CARPC-20-0001
:
Residential
:
100
:
A
:
1/10-
:
:
Proposed Site Address
:
COUNCIL A
:
385
:
23
:
1.00
:
100
Existing Building Permission Details
RESIDENTIAL
Residential
Single Dwelling
1430.23 Sq. mt.
1
1
1
0.00
0.90
1426.23 Sq. mt.
0.00 Sq. mt.
4.00 Sq. mt.
0.00
0.00
3.90
Yes
 
No
 
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor UseParking FloorGround FloorStilt FloorFloor Height(Below Ground Level(Meter))Basement FloorRe-Creation FloorService FloorPodium FloorTerrace FloorStep MarginSpecify Floors With Identical Plan And BUA Polyline
GROUND FLOOR3.000.000.001426.23NYesYesYes0.000.00NNoNoNo0.000
Existing Building Permission Details
RESIDENTIAL2
Residential
Single Dwelling
1430.23 Sq. mt.
1
1
1
0.00
0.90
1426.23 Sq. mt.
0.00 Sq. mt.
4.00 Sq. mt.
0.00
0.00
3.90
Yes
 
No
 
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor UseParking FloorGround FloorStilt FloorFloor Height(Below Ground Level(Meter))Basement FloorRe-Creation FloorService FloorPodium FloorTerrace FloorStep MarginSpecify Floors With Identical Plan And BUA Polyline
GROUND FLOOR3.000.000.001426.23NYesYesYes0.000.00NNoNoNo0.000
Revised Building Permission Details
RESIDENTIAL
Residential
Single Dwelling
166.9 Sq. mt.
1
2
1
0.00
0.60
162.90 Sq. mt.
0.00 Sq. mt.
4.00 Sq. mt.
0.00
0.00
6.60
Yes
 
No
 
 
Floor NameFloor Height(m)Bottom LevelTop LevelFloor AreaFloor UseParking FloorGround FloorStilt FloorFloor Height(Below Ground Level(Meter))Basement FloorRe-Creation FloorService FloorPodium FloorTerrace FloorStep MarginSpecify Floors With Identical Plan And BUA Polyline
GROUND FLOOR3.000.000.0081.45NYesYesYes0.000.00NNoNoNo0.000
FIRST FLOOR3.000.000.0081.45NYesYesYes0.000.00NNoNoNo0.000
 
 
Done
Pending
Reject
Engineer
Pending
Approved
Service Name : Revised Building Permission
Steps No. Authority / ApplicantDesignationApplication Received DateApplication Forward/Approve DateDuration(In Days)Expected Completion DaysDelay(In Days)Project Verified By TechnicalPre Approval PaymentDocument VerificationSite InspectionPost Approval Payment VerificationPost Approval PaymentArchitect Digital Signature StatusCertificate IssuedStatus / ActionRemark
1Kartik Maskare Engineer29/10/202029/10/2020160NANANANANANANAForwarded-
2Sanjay katekarCity Engineer / Sectional Engineer29/10/202029/10/2020000NANANANANANANAForwarded
3Sudhir SalunkheAssistant Town Planner29/10/202029/10/2020000NANANANANANANAForwarded
4Sudhir SalunkheAssistant Town Planner29/10/202029/10/2020000NANANANANANANAForwarded
5Sudhir SalunkheAssistant Town Planner-29/10/20201300NANANANANANAProposal Reassign
6Kartik Maskare Engineer29/10/2020-160NANANANANAProposal Resubmit PendingNA
Revised Building Permission Insepction Report Detail
Sr No.AuthorityDesignationSite Visited DateVisit Start TimeVisit End TimeSite Inspection Report
1Sudhir SalunkheAssistant Town Planner29/10/202012:30 pm02:30 pmView pdf