BUILDING PLAN MANAGEMENT SYSTEM
By Urban Development Department
\
Important Notice: We are going to conduct BPMS application training every Wednesday 11am to 12pm. Click on the link:-
https://shorturl.at/hGZ37
Proposal Status for Revised Building Permission
Proposal No
:
5485
Application No
:
RCARPC202000432
Owner Name
:
Priyesh Madhukar Panvalkar
Additional Owner List
:
View
×
Additional Owner List
Sr No
Name
Address
Mobile No
Email
Proposal Date
:
27/10/2020
Proposal Code
:
CHGQ-CARPC-20-0004
Proposal Type
:
Residential
Proposal Plot Area
:
111
TDR Zone
:
A
Site Area
:
1/10-
Existing Building Permission Details
:
View
Site Details
Site Address
:
Proposed Site Address
Site Location
:
COUNCIL A
Survey Number
:
375
Plot Number
:
651
Premium FSI
:
1.00
Plot Area
:
111
Building and Floor Details
Existing Building Permission Details
Building Type :
RESIDENTIAL
Building Category :
Residential
Sub Category :
Single Dwelling
Total Built Up Area :
98.74 Sq. mt.
No.of Tenements :
0
No. of Levels :
1
No. of Buildings :
1
Basement Height(m) :
0.00
Plinth Level(m) :
0.90
Residential Built Up Area :
94.74 Sq. mt.
Commercial Built Up Area :
0.00 Sq. mt.
Industrial Built Up Area :
4.00 Sq. mt.
Educational Buildup Area :
0.00
Institutional Buildup Area :
0.00
Building Height :
3.90
Plinth Intimation Taken :
No
Part Occupancy Taken :
No
Floor Details
Floor Name
Floor Height(m)
Bottom Level
Top Level
Floor Area
Floor Use
Parking Floor
Ground Floor
Stilt Floor
Floor Height(Below Ground Level(Meter))
Basement Floor
Re-Creation Floor
Service Floor
Podium Floor
Terrace Floor
Step Margin
Specify Floors With Identical Plan And BUA Polyline
GROUND FLOOR
3.00
0.00
0.00
94.74
N
Yes
No
Yes
0.00
0.00
N
No
No
No
0.00
0
Proposal Timeline Details
Done
Pending
Reject
Engineer
Pending
Approved
Service Name
: Revised Building Permission
Steps No.
Authority / Applicant
Designation
Application Received Date
Application Forward/Approve Date
Duration(In Days)
Expected Completion Days
Delay(In Days)
Project Verified By Technical
Pre Approval Payment
Document Verification
Site Inspection
Post Approval Payment Verification
Post Approval Payment
Architect Digital Signature Status
Certificate Issued
Status / Action
Remark
1
Kartik Maskare
Engineer
27/10/2020
28/10/2020
1
6
0
NA
NA
NA
NA
NA
NA
Forwarded
-
2
Sanjay katekar
City Engineer / Sectional Engineer
27/10/2020
28/10/2020
0
0
0
NA
NA
NA
NA
NA
NA
NA
Forwarded
3
Sudhir Salunkhe
Assistant Town Planner
27/10/2020
28/10/2020
0
0
0
NA
NA
NA
NA
NA
NA
NA
Forwarded
4
Sudhir Salunkhe
Assistant Town Planner
27/10/2020
28/10/2020
0
0
0
NA
NA
NA
NA
NA
NA
NA
Pending
5
Sudhir Salunkhe
Assistant Town Planner
-
28/10/2020
1
30
0
NA
NA
NA
NA
NA
NA
Proposal Reassign
6
Kartik Maskare
Engineer
28/10/2020
-
1
6
0
NA
NA
NA
NA
NA
Proposal Resubmit Pending
NA
Revised Building Permission Insepction Report Detail
Sr No.
Authority
Designation
Site Visited Date
Visit Start Time
Visit End Time
Site Inspection Report
1
Sudhir Salunkhe
Assistant Town Planner
27/10/2020
03:00 pm
05:00 pm
View pdf
Close